A virtual FCS can be prepared on a EWS. Both the control functions in FCS and operation and monitoring on HMI can be tested with the test environment. This enables debugging without FCS hardware, and partial application testing to reduce engineering lead-time dramatically. For system expansion and modification, the application can be tested and confirmed without any impact on the plant.