Category Sitemap
Home / Our Businesses / IA / Products / System Migration / Technical Capabilities /
Case Studies
Case Study - Yokogawa
  1 2 3  
To generate the maximum return with a minimum of investment and ensure that customers remain competitive, Yokogawa is providing solutions for the migration of legacy CENTUM V, CENTUM-XL and μXL DCS systems to new production control systems that employ the latest technologies.
Smurfit-Stone Container Corporation, USA
Smurfit-Stone Container Corporation, USA
Panama City Mill
Control System Upgrade

- Smooth conversion of existing controls solely by customer

- Lowered cost of ownership

Phased Migration for the CENTUM V, CENTUM-XL
Phased Migration for the μXL



General specification documents below are available at Yokogawa Plus.
Please register to access these documents.


General Specifications:
CENTUM V and CENTUM-XL Migration to CENTUM CS 3000 GS 33Q06W30-31E
Migrating to CENTUM CS 3000 from CENTUM V or CENTUM-XL Operator Station GS 33Q06Z81-31E
Migrating to CENTUM CS 3000 from mXL Operator Station GS 33Q06Z82-31E
μXL Operator Station Migration Kit for CENTUM CS 3000 Entry Class GS 33Q06Z83-31E
GLOBAL  
YOKOGAWA

Powered by Ultraseek
·  Case Studies
A free CD available
Featured Sites
Top of this page
  1 2 3