Category Sitemap
Home / Our Businesses / IA / Products / System Migration / Technical Capabilities /
Case Studies
Case Study - Yokogawa
  1 2 3  
Phased Migration for the CENTUM V, CENTUM-XL

Phased migration for the CENTUM V, CENTUM-XL is a three-step upgrade method on a component basis, which reduces the required investment and manpower, and shortens the upgrade period.
Upgrading of HMI brings in the latest HMI environment and network capability, surely one of the most important issues.

Upgrading of HMI

By utilizing the existing field wiring and I/O cards, the latest control functions are provided, while greatly improving performance and application capacity.

Upgrading of CPU of FCS

Using existing field wiring, the latest I/Os are provided with full compatibility of functions, interface and cabinet layout.

Upgrading of I/Os

GLOBAL  
YOKOGAWA

Powered by Ultraseek
·  Case Studies
A free CD available
Featured Sites
Top of this page
  1 2 3