SS2013Power
22/58

17PowerExecutive SummaryThe Tuas Power Station and its associated facilities are located on reclaimed land along the western shore of Singapore. The station occupies an area of approximately 75 hectares and is being built in two stages. Stage I of Tuas Power Station is comprised of two 600 MW oil-fi red steam-generating sets. The power station entered commercial operation in March 1999 when the fi rst of these units was fully commissioned. As part of its work in stage I of this project, Yokogawa supplied the CENTUM CS integrated production control system (DCS) for the plant’s very large power generation units. Yokogawa Electric Asia Pte. Ltd., Singapore produced the control system in Singapore and carried out all engineering work.In addition to supplying Instrumentation & Control (I&C) equipment, Yokogawa handled system design/engineering, confi guration, project management, commissioning services and maintenance. The Tuas Power Station successfully entered commercial operation on schedule and the plant owner has attributed this in part to Yokogawa’s good performance in delivering both products and services.The development of Stage II comprised of four-block combined cycle power plants was completed in September 2005, which brought the Station to its licensed capacity of 2,670 MW. Safe and Effi cient Power Plant OperationPlant InformationPlant name: Tuas Power StationLocation: Tuas, SingaporeProject type: NewPlant type: Gas and oil fired power plantOutput: 1,200 MW (2 x 600 MW)Order date: July 1995Completion: March 1999

元のページ 

10秒後に元のページに移動します

※このページを正しく表示するにはFlashPlayer9以上が必要です