- Home>
- Products & Solutions:
- Industrial Automation and Control Business:
- Success Stories:
- Oil and Gas:
- BP-LPG Terminal, China:
- Chevron Nigeria Limited, Nigeria:
- BP Canada Energy Company, Canada:
- PTT Exploration and Production Plc., Thailand:
- BP Wytch Farm Oilfield, UK:
- Universal Terminal (S) Pte Ltd, Singapore:
- Petroleum Development Oman, Oman:
- Saudi Aramco GOSPs, Kingdom of Saudi Arabia:
- Scarab Saffron, Egypt:
- Mobil Oil, Indonesia:
- Shell UK Exploration and Production, United Kingdom:
- TotalFinaElf, Angola:
- Total E&P France, France:
- EPNL, Nigeria:
- NAM, The Netherlands:
- SembCorp Industries, Singapore:
- Shell Philippines Exploration B.V., Philippines:
- Shell Petroleum Development Company of Nigeria, Nigeria:
- CACT Operation Group, China :
- PTT Public Company Limited, Thailand :
- Nederlandse Aardolie Maatschappij, The Netherlands:
- Qatar Petroleum, Qatar:
- BP, North Sea, UK:
- Prosafe Production Services Pte Ltd, Singapore:
- BP Sharjah, UAE:
- Malaysian Gas Processing and Transmission Company, Malaysia:
- NAM-Den Helder, Den Helder, The Netherlands:
- Indian Oil Corporation Ltd., Chennai, India:
- Nederlandse Aardolie Maatschappij BV (NAM), Groningen, The Netherlands>
- BP Wytch Farm Oilfield, UK
Success Stories
BP Wytch Farm Oilfield, UK
|
![]() |
Executive Summary

BP Wytch Farm Oilfield
Developed by BP, Wytch Farm is Western Europe's largest onshore oil field, and is located in one of the most environmentally
sensitive areas of the UK. The total estimated recoverable reserves are 480 million barrels, of which over 90% lie in the
Sherwood reservoir, making it the sixth largest in the UK.
The oil gathering operation comprises a central gathering station and a number of remote well sites to the west and south
of Poole in Dorset. The site was established in the early 1980s and this project is part of a development plan that will enable
the operational life to be extended at least 15 years.
Well fluids are recovered to the gathering station for processing and separation. Gas is used to fuel on-site generation and is exported via a 45 km pipeline to a local NGC site. Oil products are exported via a 90 km pipeline to Hamble tank farm and directly from site by road tanker. Recovered water is used for injection at some well sites. Wytch Farm is located in Dorset approximately 28 km from Poole, 10 km from Wareham. The Wytch Farm oil field comprises three separate oil reservoirs that lie under Poole Harbour and Poole Bay in Dorset.
The Challenges and the Solutions

Well Site
Yokogawa was selected by BP as the main automation contractor (MAC) for the project and the Yokogawa project team worked closely with the BP team during the project implementation. As a project within an operating site, the major challenges were the initial definition of the project scope and requirements in a front-end engineering & design (FEED) study, which included a site survey, document verification, change over planning and interface with existing infrastructure. This was followed by implementation of a smooth hot cutover to the new integrated control and safety system during the commissioning phase.
This project replaced the existing Emerson Provox control system, Servelec GEM80-based safety system, Honeywell FSC dual redundant PLC system, Eurotherm process automation controllers, and Transmitton SCADA/RTU previously used to monitor and control the gathering and processing operations. During the FEED phase, the Yokogawa FEED team was resident at the Wytch Farm site for site survey work, liaising with the BP engineers and collecting the engineering data necessary to complete FEED before commencement of the detailed design. A one-team approach by BP and Yokogawa was achieved by managing the business relationship in an open, performance-focused, and collaborative manner with a shared desire to deliver superior long-term value. In addition, a number of lessons were learned during the various phases of the project which were made available to the wider BP community via the global agreement between BP and Yokogawa.
Customer Satisfaction
Ian Bennett, Project Manager - Automation Excellence, BP Wytch Farm says “Yokogawa worked collaboratively with the on-site BP team through the many challenges of the FEED phase and subsequent design, build & test phases, delivering the system on time. Lessons have been learned, especially associated with the preparation of the loop diagrams and subsequent commissioning phase which will benefit the management & planning of future retrofit projects. We commend Yokogawa for the open and honest way they have accepted responsibility in taking the lessons process forward.” BP confirms its satisfaction in the way Yokogawa has completed the Wytch Farm distributed control system (DCS) and safety instrumented system (SIS) upgrade project.

|
Ian Bennett Project Manager Automation Excellence BP Wytch Farm |
Key Project Performance Achievements
- 100% health, safety, security, and environment performance
- No plant shutdown as a result of the project
- Project delivered on time
- Smooth and safe changeover to the new system
- One-team approach with client project team
- High level of customer satisfaction
Number of DCS I/Os: 4,976
Number of ESD/BMS I/O: 893
Number of RTU I/O: 132
Number of subsystem interfaces: 17
System Information:
1 x ExaOPC server for interface
2 x plasma screens (52” HD)
ESD/BMS: 4 x SCS, 1 x SENG
RTU: 6 x STARDOM
Advanced operation assistance: Exapilot, Exaplog