James River Power Plant Replaces Legacy Control System
| Location: |
James River,Springfield, MO, USA |
| Order Date: |
March 2006 |
| Completion: |
April 2007 |
| Industry: |
Power |
|
 |
|
In 1957, the City Utilities of Springfield, MO, commissioned a pneumatic distributed control system for its James River
Power Plant. At that time, the plant was considered very advanced because it utilized a centralized control room for
operations, instead of a series of separate control stations located throughout the facility.
“Through the years since,” explained Maintenance Manager Steve Stodden, “We had attempted to keep the existing system
functional, but maintaining a 50-year-old system has proven difficult. Several years ago we started discussions with all plant
personnel involved about upgrading the old control system to improve the safety of the plant and to take advantage of
modern digital technology. The result is that we now operate our five generating units with varying stages of a new CS 3000
control system from Yokogawa.”
|
 |
“Our evaluation of competing vendors was based on consideration of a combination of factors with (the) awareness that the
new system will probably be in place for decades until the current facility is retired,” said Stodden. “We had to be confident
of the vendor's support during this extended future time period.”
With the vendor selected, system details were then examined. The initial bid was based on 4-20 mA protocol but replaced
by FOUNDATION fieldbus™ as advantages of FOUNDATION fieldbus™ emerged. The
plant has five generating units with a total capacity of 253 MW – two 22 MW, one
44 MW, one 60 MW, and one 105 MW. |
 |
 |
 |
| |

 |
|
|
“We decided to handle all the new-system installation in-house,” said Stodden.
“That way our personnel would be very familiar with everything involved. We were
delighted with how smoothly the entire procedure went, and we completed
installation in only six weeks. We had virtually no problems with the CS 3000
hardware or software. Our biggest obstacle was moving the electrical interlocks
required to combine the two control rooms into one. If the Yokogawa system had
not worked so well, we would never have made our startup dates.”
“Originally,” he continued, “Units 1 and 2 were housed in one control room, while Units 3, 4 and 5 were housed in a separate
control room. As part of this project, we combined these into one. The new system has worked so well, that we now utilize
one control operator to run both Units 1 and 2, where before each unit had a dedicated control operator assigned to each
unit.”
“Units 3, 4 and 5 use a ‘hybrid’ configuration. These units are equipped with an older control system platform, utilizing
Hand-Auto Stations for operator interface. This control system, while dated, is still supported. Therefore, as a step toward
uniformity among the units, we utilize the Yokogawa Operator Console Platform to communicate with the older control
system hardware already in place. The operators see the same style of operator screens as Units 1 and 2, without realizing
that it is utilizing a completely different control system. Annunciators and selected other functions work directly from the
CS 3000 control; control loops are displayed on the CS 3000 screens but are processing existing control loops through an
interface.”
When asked about acceptance by operators of the new electronic system, Stodden illustrated by quoting one of the men
who initially said he thought the ‘…new system was the worst decision we had ever made.’ But within two months after
startup, the same operator asked ‘When are we going to do the other three units?’ Suffice it to say that by now our
operators are very comfortable and pleased.”
The CS 3000 system has provided the ability for automatic control sequences not previously practical. For example, shutting
down a coal feeder used to require many control manipulations to maintain safe operation of the boiler. The entire sequence
is now automatic. “We just hit a key and sit back to watch everything progress through the control sequence,” says Stodden
with a satisfied smile.
|
 |
|
|
System Configuration
|
|
The plant, which celebrated its 50th
anniversary this year, consists of five coalfired
boilers equipped with steam turbines
and two natural-gas-fired turbines. The
plant initially was designed to utilize natural
gas as its primary fuel, with coal as a winter
backup fuel. This switched during the late
1970's driven by the Powerplant and
Industrial Fuel Use Act of 1978. The station
now utilizes less than 1% natural gas for
fuel for the steam boilers.
Ultra Low-NOX burners and Overfire Air
were installed recently to greatly reduce
nitrogen oxide emissions in preparation for
EPA standards that go into effect in 2009.
All units of James River Power Station
remain capable of burning either 100% coal or 100% natural gas in order to produce electricity.
The plant currently supplies slightly more than half of the electricity generated by City Utilities. Forced outages at the plant
during the last three years have averaged slightly more than 1%, which is approximately one-fifth of the national average. |
 |
 |
| System: |
CENTUM CS 3000 |
| Total I/O: |
Approximately 1,400 |
| System Configuration: |
9× HIS, 1× EWS, 1× SIOS, 1× GSGW |
| Other: |
PRM (Plant Resource Manager), FOUNDATION fieldbus™, Bailey INFI90 Interface |
| Scope: |
System, Project Management, Design, Configuration Engineering, Commissioning Services |
|
|
|
| · |
James River Power Plant, USA |
|
 |
|
|