PTT Utility Company Limited CPU2, Rayong, Thailand
CENTUM CS 3000
- Monitoring of heat balance and performance calculation with CENTUM CS 3000
- A single operator on each shift can monitor the entire plant from the CS 3000 graphic user interface

District Cooling System and Power Plant Co., Ltd. Samutprakarn, Thailand
District Cooling System and Power Plant Co., Ltd. Samutprakarn, Thailand
CENTUM CS 3000
94MW, 80t/h
- All correct operation procedures are carefully configured in the CENTUM CS 3000 and smoothly in operation
- CENTUM CS 3000 ensures stable supply of electricity and steam to Bangkok’s Suvarnabhumi airport

Japan Wind Development Co., Ltd., Aomori, Japan
STARDOM, FA-M3
34X1.5MW
- The STARDOM network-based control system and FA-M3 range-free controllers play an important role in smoothing out the supply of this power to the grid
- STARDOM and FA-M3 ensure smooth supply of power to grid by wind farm equipped with large-capacity NAS batteries

A.T. Biopower Co., Ltd. Pichit Province, Thailand
CENTUM CS 3000, Field Instrument, CEMS
22.5MW
- Thai SPP uses CENTUM CS 3000 to improve efficiency of Biomass Power Plant
- The burning of the ground rice husks in the boiler’s furnace chamber is a complex process that must be carefully controlled

NEP SOLAR Pty Ltd, Charlestown, NSW, Australia
HXS10, FAST/TOOLS
- Yokogawa’s HXS10 solar controller optimizes conversion efficiency at Australian solar cooling plant
- Accurate sun tracking and visualization of all process data

Australian National University, Canberra, Australia
Control system for 0.1MW, solar power test plant
- Australian National University’s "Big Dish" controlled by Yokogawa PLC and FAST/TOOLS SCADA
- FAST/TOOLS benefits us in many ways and allows us to clearly see the entire process, giving us the information we need to take immediate action

EGCO Cogeneration Co., Ltd., Rayong, Thailand
Control system for 120MW, gas-fired EGCO Cogeneration Plant
- Fully automated power plant supplies steady flow of electricity to national grid
- The CENTUM CS 3000 plays a core role by controlling and enabling the monitoring of all processes at the EGCO Cogen plant

Thai National Power Co., Ltd., Rayong, Thailand
Control system for 120MW, gas-fired Thai national cogeneration plant
- Fully automated power plant supplies steady flow of electricity to national grid
- CENTUM CS 3000 achieves safely start-up and shut-down the plant at any situation

Pha Lai 2 Thermo Power Joint Stock Company, Vietnam
Control system for 600-MW (2 x 300-MW), coal-fired Pha Lai 2 power station
- Steady power supply and safe operation thanks to reliable Yokogawa CENTUM CS 3000 and transmitters
- Environmentally optimized operation by fine-tuned boiler combustion control and strict monitoring and control of CO, NOx and SOx in flue gas and pH of water from cooling towers
- Full replica plant simulator for effective plant operation and engineering staff training
- Annual maintenance contract

PetroChina Company Limited, China
Control System for 300-MW coal-fired utility plant of Dushanzi Refinery & Petrochemical Complex, comprising five 440 t/h circulating fluidized bed boilers and three 100-MW turbine generators
- Steady boiler control by CENTUM CS 3000 with dual redundant CPUs and seven 9s availability
- Total plant information integrated into supervisory information system via OPC interface
- Reduced water, coal and other resource consumption

Samutprakarn Cogeneration Co., Ltd., Thailand
Replacement of control system for 126-MW, gas-fired Samutprakarn cogeneration power plant
- Power supply made dramatically reliable thanks to CENTUM CS 3000 with seven-nines availability
- Visualization of almost all plant data on the same HMI by linking up subsystems via Modbus
- Improved plant performance

Energy Brix Australia Corporation, Australia
Replacement of control system for 180-MW, coal-fired Morwell Power Station
- 2009 PACE Zenith joint winner project
- Reduced operating and maintenance costs
- Increased power generation
- Improved plant operating flexibility
- Modernized, screen-based operations
- Reduced emissions

SC Electrocentrale Bucuresti SA (ELCEN), Romania
Control system for green-field, 186-MW (electric), 197-MW (thermal), gas-fired Bucuresti Vest Combined Cycle Heat and Power Plant
- Unified operator interface thanks to CENTUM CS 3000/UOI
- Automated plant startup and shutdown using new block sequences

- Advanced alarm management using consolidated alarm management software

The 4th Thermal Power Plant, Mongolia
Replacement of control system for 560-MW (8 x 420 t/h) coal-fired power plant
- Modernized controls, assured stable power supply to Ulaanbaatar by a highly reliable, expandable distributed control system
- Fully automated boiler, burner, balance-of-plant operations
- Power plant simulator for efficient DCS operator training

James River Power Plant, USA
Total Capacity of 253 MW, Coal and Gas Fired, System Replacement
- Replacement of legacy control system by CENTUM CS 3000
- Replacement of 4 – 20 mA protocol to FOUNDATION fieldbus™

Greater Toronto Airports Authority (GTAA), Canada
Replacement of control system for 117-MW, gas-fired cogeneration power plant at Pearson International Airport
- Monitoring and control of the entire cogeneration plant including the two once-through steam generators
- Reliable and cost-effective power supply
- Operator-friendly HMI

Kraftszer Kft., Hungary Füredi Power Plant
3 x 6MW, Gas Fired, Greenfield Site
Combined Heat & Power Plant Management Solution
- Easy set point definition for all plant power generation operations
- Stable electric power generation
- Power plant optimization
- Control of electric power generation based on net performance

ENECO Energie, The NetherlandsROCA Power Station
Heat and CO2 Transfer System
- Reduced cabling costs by using a commodity GPRS network infrastructure
- Additional reduction in system cost by making full use of existing components
- Reduction in cost of software by using all web-based technology
- Long-term service contract — no need to worry about a suspension of maintenance services

PNOC-EDC, Philippines
Northern Negros Geothermal Power Plant
49MW, Greenfield Site
Steam Supply Control System
- State-of-the-art FOUNDATION fieldbus technology
- Plant Resource Manager (PRM) field device management system
- Remote data monitoring via WAN

Eraring Power Station, Australia
4 x 660 MW, Coal Fired, Plant Revamping
Highly integrated control and monitoring systems solution for Australia’s largest power station

Yonghung Thermal Power Plant (Unit 1 & 2), Korea2 x 800 MW, Coal Fired (Supercritical), Greenfield Site
Smooth and rapid plant commissioning using a full-replica plant simulator

Tachibanawan Thermal Power Station, Japan2 x 1,050 MW, Coal Fired, Greenfield Site
Control solutions for environmental control facilities

BBE & BBG Plants, Spain
800 MW, Gas Fired, Greenfield Site
Combined cycle power plant with regasification facility realizes stable power supply

Liddell Power Station, Australia
4 x 500 MW, Coal Fired, Plant Revamping
A cost-effective solution for Australia's largest electricity producer

Itoigawa Power Plant, Japan149 MW, Coal Fired (CFB Boiler), Greenfield Site
Flexible control solution for IPP generation facility with CFB boiler

AGL Hallett Power Station, Australia
200 MW, Gas and Oil Fired, Greenfield Site
Unified operator interface solution enables remote operation

AGL Somerton Power Station, Australia
150 MW, Gas Fired, Greenfield Site
Unified operator interface solution enables remote operation

Tuas Power Station (Stage One), Singapore
2 x 600 MW, Oil Fired, Greenfield Site
Total solutions enhance a plant's workforce

Wallerawang Power Station, Australia
2 x 500 MW, Coal Fired, Plant Revamping
Reliable DCS achieves low total cost of ownership