Category Sitemap
Home / Our Businesses / Controllers & Data Acquisition / Support / FAQ /
Frequently Asked Questions

PR300 Power and Energy Meter
Questions
Answers
The PR300's demand measurement function measures average power or average current within a specified time limit. The maximum value during the demand measurement period can also be measured. An alarm is output (open collector) if a specified demand alarm point is exceeded. A demand alarm mask time can also be set to prevent unnecessary alarms near the start time within the time limit. Find out more about the PR300 Power Monitor here.
Yes. Any measurement element can be assigned to any of the three displays (upper, middle or lower). Specified phases of voltage and current can also be assigned, and you can scroll the displays through the phases with the SEL key. Find out more about the PR300 Power Monitor here.
GLOBAL  
YOKOGAWA

Powered by Ultraseek
FAQ
·  PR300 Power and Energy Meter
Contact Form
If you can not find your answers here, please feel free to contact us.
Contact