Category Sitemap
Home / Our Businesses / IA / Industries / Power Industry / Solutions /
Know in Advance
Overview · Key Enablers Case Study
Key Enablers
  1 2 3  
Yokogawa’s full-replica plant simulator performs highly accurate modeling of actual plant behavior under any scenario for optimized operation and control.
Stunning 99% accuracy
- Yokogawa’s TICSS simulation system achieves 99% accuracy ( >99% steady state; >95% dynamic state).
Interface with multiple control systems
- Our full-replica simulator system covers your entire power plant, no matter whose control technology is deployed, working not only with the Yokogawa DCS but also with other venders’ systems.
Plant operation optimization
- You can modify, test, and improve alternative process designs and control procedures on the simulator to optimize plant operation.
GLOBAL  
YOKOGAWA

Powered by Ultraseek
·  Know in Advance
Envision a power plant



What is a VigilantPlant?
more
And VigilantPlant solutions...
more
Contact us
  1 2 3