Mr. U. Tumurkhuyag, Executive Director of TPP4, commented, “Yokogawa is a trusted partner for TPP4. No one took shortcuts amid the numerous challenging situations. Yokogawa is always fully committed to maximizing value for customers. We believe that TPP4 will continue to grow through our long-term relationship with Yokogawa.”Mr. U. Tumurkhuyag30Customer SatisfactionAs most of the existing systems and equipment had been installed in the 1980s, little information and documentation about their operation and maintenance was available. There were many blind spots even during site installation and commissioning; Yokogawa engineers boldly and flexibly tackled unexpected challenges that arose. Finally, modernization of the turbine control and governing systems resulted in more flexible and stable operation. Ulaanbaatar TPP4 / Mongolia