SembCorp Industries, SingaporeWhile pipeline automation solutions may account for but a tiny fraction of the total value of a pipeline construction project, they obviously can have a major impact on the amount of revenue that a pipeline can generate. To this end, an automation supplier should be able to provide:

  • A total pipeline automation package
  • Long term support, maintenance, and system up-keep.

It is worth looking very closely at all of these issues, especially in areas that are covered by safety legislation as well as rapidly changing automation technologies.

Project

SembCorp Industries and Indonesia have signed a $4-billion, 22 year sales agreement that will secure the daily supply of 325 million standard cubic feet of gas to Singapore until the year 2023. The gas will be transported via a 640-km submarine pipeline from Indonesia's West Natuna gas fi eld to Singapore's Jurong Island. Current users of the gas are Tuas Power, SembCorp Cogen Power, Seraya, Exxon Mobil, and Elba. The last part of the pipeline, the onshore receiving and distribution section, was engineered by Sembawang Engineering. Yokogawa Engineering Asia was the main instrument vendor for this project, delivering the total control system, including SCADA / PLCs, the FAST/TOOLS SCADA package, emergency shutdown (ESD), leak detection, billing, nomination and allocation, internet protocol (IP) telephony, video communications and network infrastructure. Design, engineering, integration, and installation were also carried out by Yokogawa.

The main driver in the system specifications was the need for highly integrated and advanced functionality and reliability. The system had to be capable of performing the fiscal monitoring and control needed to manage the gas supply contracts between the supplier and end-users, and this required the use of a specialized nomination, allocation and billing package. In addition, the system had to be capable of handling significant expansion to allow for more end-users and gas suppliers, both through existing and new pipelines. Safety and reliability were also major concerns, hence the inclusion of a specialized leak detection package as well as a dedicated and certifi ed ESD system.

The entire system had to be tightly integrated to allow reliable operations with a minimum number of operational staff, which was essential to optimize the operating costs of the pipeline. This requirement mandated the use of a number of leading edge technologies, including object linking and embedding for process control, virtual private networks with fiber optic links, redundant Ethernet, IP telephony and video web technology. Redundant fiber-optic cables were set up in a ring configuration and, as a backup in case of total fiber optic failure, leased telephone lines were connected to the control PLCs at the end-user locations.

Furthermore, Yokogawa integrated the complete system with field instrumentation, PLC systems from Modicon and Allen Bradley, the Yokogawa ProSafe ESD system, flow computers, gas chromatography and dew point analyzers. The full integration of the leak detection package with the allocation, nomination and billing software was carried out by Energy Solutions International.

The result was an integrated pipeline automation system using Ethernet TCP/IP as the communications network and having sufficient bandwidth for control information, the IP telephone system and the CCTV web server.

Yokogawa's complete system was operational six months ahead of schedule and the official opening was on January 15, 2002.

SYSTEM DETAILS

System: FAST/TOOLS SCADA
Total I/O: 1,000
System Configuration: Leak detection, Nomination, Allocation & Billing package, Yokogawa ProSafe PLC, Yokogawa Fieldeye CCTV camera, Modicon PLC, Allen Bradley PLC, Omni flow computers, Hirschmann network equipment & CISCO IP phones

Industrias

Productos y Soluciones Relacionadas

FAST/TOOLS

Empezó como un proyecto de Sistema Flexible de Técnicas Avanzadas (FAST), el FAST/TOOLS hoy en día es un paquete completo y totalmente integrado de aplicaciones SCADA. Potente y flexible, el FAST/TOOLS sirve en instalaciones que van desde procesos unitarios de 50 puntos a multimillonarios puntos de producción offshore y sistemas tuberías que se extienden a lo largo de miles de millas. 

Sistemas SCADA

Tradicionalmente utilizados para el monitoreo y control de la infraestructura como son los ductos y servicios públicos, los sistemas de control de supervisión y adquisición de datos (SCADA) han extendido sus beneficios a través de las industrias de proceso. Su evolución hacia las soluciones de automatización y administración de información de todas las Empresas ha mejorado aún más su valor para los usuarios.

×

Have Questions?

Contact a Yokogawa Expert to learn how we can help you solve your challenges.

Top