DCS, SIS, PRM, FOUNDATION™ fieldbus instruments, and OTS Installed at Thailand's First LNG Terminal

PTT LNG Company Limited logo
下載 (652 KB)

Executive Summary

PTT LNG Company Limited, Rayong, Thailand
PTT LNG Company Limited, Rayong, Thailand

Natural gas is Thailand's primary fuel source and is absolutely essential to the country's industries, particularly the power sector: two third's of the country's electricity is generated at gas-fired power plants. Much of Thailand's natural gas comes from gas fields in the Gulf of Thailand. It is transported throughout the country via a network of offshore and onshore pipelines built by the national gas and oil company, PTT Public Company Limited (PTT PCL). In 2005, due to economic growth and the resulting shortfall in the supply of natural gas, the country's National Energy Policy Board resolved to begin importing LNG.

In anticipation of this policy shift, PTT PCL established PTT LNG Company Limited (PTTLNG) in 2004 and tasked it with building and operating the country's first LNG import terminal at Map Ta Phut, a deepwater port 220 km southeast of Bangkok. They send out gas to the adjacent Map Ta Phut industrial estate, which is one of Thailand's most important industrial areas and home to a number of petrochemical, oil refining, steel, and fertilizer plants. Gas also be transported via the PTT pipeline system to power companies and other important industrial customers throughout the country.

 
 

Construction of the first terminal commenced in early 2008 and was completed in 2011, and the terminal began commercial operation later that year when it received its first shipment of LNG from Qatar. This terminal includes a jetty capable of receiving LNG carriers with capacities up to 264,000 m3, two 160,000 m3 full containment LNG tanks, a 5 million ton/year regasification (vaporizer) train, a boil-off gas recondensor, a sendout station, and an LNG pump.

To control key terminal facilities, PTTLNG went with a Yokogawa solution consisting of the CENTUM VP production control system, ProSafe-RS safety instrumented system, OmegaLand operator training system (OTS), asset management package - Plant Resource Manager (PRM), and FOUNDATION fieldbus field digital technology. Work on this project was executed by Yokogawa, which functioned as main automation contractor (MAC).

PTT LNG terminal overview
PTT LNG terminal overview

The Challenges and the Solutions

1. Safe, uninterrupted operations
Customers all over the country rely on receiving a regular supply of gas from this LNG import terminal, which operates 24/7. It is thus absolutely essential to prevent any shutdowns or other problems that would interrupt this supply. A key asset that makes this possible is the OmegaLand OTS. In preparation for the arrival of each LNG carrier, operators in the central control room (CCR) run simulations of all key terminal processes such as offloading and regasification on the OTS. This reduces the likelihood of any mistakes and ensures smooth and safe terminal operations.

While configuring this fully integrated control system solution for PTTLNG, Yokogawa strictly followed the following safety standards:

  • NFPA59A (National Fire Protection Association) standard on production, storage, and handling of LNG
  • EN1473 (European Norm) standard on onshore installation and equipment design for LNG
  • SIGTTO (Society of International Gas Tanker and Terminal Operations Limited) operating standard and best practices for gas tanker and terminal operations

Once all personnel are all fully trained and gain sufficient experience in operating this terminal, the plan is for it to operate with just six personnel on each 12 hour shift: one supervisor, one board operator, and four field operators.

2. Asset maximization
The transmitters, flowmeters, and control valves throughout this terminal are all FOUNDATION fieldbusenabled and can be continually monitored using the PRM solution. Alarms are issued before any device fails completely, enabling predictive maintenance that reduces maintenance costs throughout the facility lifecycle. The complete integration of all systems including those at the jetty substation, laboratory, fire station, and truck loading administration room as well as 10 other subsystems via Modbus communications allows operators at the CENTUM human interface stations (HIS) in the CCR complete real-time access to information on operations throughout the terminal. This ensures that they have all the information needed to make the right decisions at the right time. PTTLNG is thus able to make maximum use of all of this terminal's assets.

Central control room
Central control room

3. Effective operator training

As this LNG import terminal is the first of its type in Thailand, it is absolutely essential from the safety and efficiency standpoints for its operators and engineers to always be fully trained on all system operations and procedures. By using the OmegaLand OTS for its operation familiarization training programs, PTTLNG is able to give its personnel repeated training for a full range of operational procedures as well as all situations that they can expect to encounter while operating and maintaining this terminal.

4. Quality control
Quality control is also essential at this terminal. The results of gas quality analysis and all associated data are entered into the laboratory instrument management system (LIMS) server in the laboratory room and all data are transferred to the CENTUM system, which generates a laboratory report allowing each operator to confirm their operating procedures and make any required adjustments to maintain high quality production.

5. Truck loading
A portion of the LNG arriving at this terminal is transported in trucks to local LNG terminals. A terminal automation system (TAS) keeps track of all essential custody transfer data such as the truck number, destination, LNG amount, date and time, and customer name, and this data is all recorded and fed back to the production control system. So operators can recognize the total LNG amount versus gasification amount and they can easily visualize the total efficiency of this plant.

LNG import terminal

LNG import terminal

產業別

  • LNG供應鏈

    在20世紀70年代,橫河電機承諾對全球LNG專案進行革新。憑藉著豐富的經驗和解決方案方面的結合,橫河電機已具備實現LNG供應鏈卓越運營的條件。

    更多
  • 終端

    今天,許多終端用戶不僅在石油,天然氣和石化行業,而且在LNG / LPG和散裝行業都面臨著共同的物流挑戰。這些挑戰包括縮短產品交付時間,提高裝載效率,適應製造過程的變化,提高安全性,提高管理效率,降低人工成本,整合數據系統,可視化操作,管理流量等。

    幾十年來,橫河一直在提供解決方案以滿足客戶對終端自動化和管理的需求。

    更多

相關產品&解決方案

  • 工廠資源管理系統 (PRM)

    設備需要經過適當管理才能實現高可靠性和穩定的工廠運營。 PRM能幫助提升維護計劃的品質,並在整個工廠生命週期內將維護成本最佳化。

     

    更多

置頂