PST Scheduler Integration

PST Scheduler Integration

Operating under PRM, PST Scheduler remotely executes the PST (Partial Stroke Test) for the Emergency Shutdown Valve. The following list shows the positioners and DTMs which have passed the integration test with PST Scheduler.

Updated: December 17, 2013

  Vendor Model Dev.
Type
Dev.
Rev.
DTM Name DTM Version PRM Revision
1 Dresser SVI II ESD 00CB 1 SVI II ESD HART
(v.203-3.1)
1.00.100.0 R3.04 or later
2 Fisher DVC6000 SIS 0003 2 Fisher Controls DVC6000? (v02.01) 1.4.138.7 R3.04 or later
3 Fisher DVC6200 SIS 000A 1 Valvelink DTM 12.0 R3.11 or later
4 Fisher DVC6200 SIS 000A 2 Valvelink DTM 12.0 R3.11 or later
5 Fisher DVC6200 SIS 130A 2 Valvelink DTM 12.0 R3.11 or later
6 Flowserve Logix3200MD 0005 2 Lgx3200MD (v.5) 1.1.7.1 R3.04 or later
7 Metso Automation VG800 00EB 6 VG800 (v.2.0) 1.12.14 R3.04 or later
8 Metso Automation VG9000H 00D9 1 VG9000H (v.1) 1.12.14 R3.05 or later
9 Metso Automation VG9000H 00D9 2 VG9000H (v.1) 1.12.14 R3.05 or later
10 SAMSON AG 373X-3 00EF 6 SAMSON 373X-3 (Rev6) (v.1.51) 1.3.2 R3.04 or later
11 SAMSON AG 373x-6 00EE 1 SAMSON 3730-6 (R1.00-1.09) 1.0.0 R3.11 or later

Prodotti e Soluzioni Correlati

Plant Resource Manager (PRM)

Plant Resource Manager (PRM) is a key platform for the Yokogawa Asset Excellence initiative which aims to improve operations and maintenance and maximize the reliability and availability of plant assets by achieving greater predictability.

 
Top