Lakeside EFW Ltd., Berkshire, England, UK

As existing fossil fuel reserves have become unviable or unreliable, the challenge of providing a secure energy supply for power generation within the UK has increased significantly in terms of both financial and environmental cost. At the same time, landfills lack the capacity to handle the increasing amount of household and municipal waste. While efforts to reduce, re-use, or recycle waste have made some headway, other options have had to be explored. One such effort underway that is making a valuable contribution toward providing a balanced and secure energy portfolio for the UK involves the extraction of energy from residual (non-recyclable) waste.

Lakeside EFW Ltd. operates an EFW (energy from waste) facility near London that is staffed by experts in energy recovery technologies who are working hard to ensure the plant remains efficient, technologically up to date, and above all, safe. The plant has the capacity to consume 410,000 tons of household and municipal waste per year and exports at least 34 MW per hour to the country's National Grid. This process diverts the majority (over 97%) of waste from landfill.

Lakeside EFW uses a mass-burn process to generate high temperature that is then used to produce high pressure steam. The steam in turn drives a turbine to produce electricity. Residues and flue gases are carefully treated to minimize the release of environmental pollutants. The facility operates under strict environmental controls, within the guidelines of the waste incineration directive (WID) and an environmental permit administered by the environment agency.

For Lakeside EFW, Yokogawa UK installed a CENTUM CS 3000 distributed control system and a ProSafe-RS safety instrumented system to automate control of the facility's boilers, burners, and balance of plant facilities. The facility has operated safely with no major system failures since coming online in 2008.


Incoming waste/Next/Incineration/Next/Generation of electricity

The Challenges and the Solutions

Lakeside EFW is continually looking for ways to operate this incineration facility more efficiently. Waste is trucked to the facility, with the vehicles being weighed on entry into the site and again on exit to calculate the amount of delivered waste. Grab cranes mix the waste in a 7,500 ton capacity bunker to obtain a more controllable calorific value, then load the waste into a hopper from where it is pushed into the incinerator by hydraulic rams. The initial firing of the boiler is achieved using an approved low sulfur diesel. Once the waste is burning inside the incinerator, the diesel burners are switched off and the waste becomes the fuel.

Superheated, dry steam created from the boiler process is used to drive a steam turbine, which in turn drives a generator set. The generator produces enough electricity to power the Lakeside facility and export 34 MW onto the National Grid. Spent steam from the turbine is condensed and pumped back to the boiler, making a closed-loop steam/water circuit. The facility has also been designed so that off-site district heating (combined heat & power - CHP) can be provided to local consumers in the future.

The bottom ash from the waste incineration process is transported by moving belts to dedicated bunkers. Ferrous metals are removed from the bottom ash for recycling. The ash is removed from the site and processed into an approved aggregate material for road building and construction.

The hot gases from the incineration process that were used to heat the water contain various compounds and chemicals that need to be treated. These gases and chemicals are cleaned in a flue gas treatment process. This uses slaked lime to absorb sulfur gases and HCL. Activated carbon to absorb dioxins and heavy metals, and ammonia to reduce NOx gases. The air is subsequently passed through a bag filter before it is released from the stacks. The emissions are monitored in real time using state of the art, independently calibrated measuring instruments to ensure compliance with permitted emissions limits.

With the integration of the Yokogawa CENTUM CS 3000 and ProSafe-RS systems, operators in the central control room enjoy ready access to operations throughout the plant. Ergonomically designed CS 3000 human interface stations (HIS) provide a window into all of this facility's processes, giving operators real-time access to all the information they need to make quick and timely decisions.

Central control room
Central control room

Customer Satisfaction

In his comments to Yokogawa, Danny Coulston, General Manager of the Lakeside EFW facility, touched on the following points:

  • Everyone at Lakeside EFW is pleased with the high reliability of the Yokogawa systems and their ease of operation and engineering.
  • The new plant was designed to meet the requirements of the European Waste Incineration Directive, which mandates tight controls on the atmospheric release of dioxins, heavy metals, acid gases, nitrogen oxides, particulates, and other products of the combustion process. This reduces environmental impact and protects human health, and the facility's emissions of dioxins and other health related pollutants are low compared to common air pollution sources such as outdoor burning and vehicle exhaust.
  • Lakeside EFW well recognizes the importance of water conservation and has designed the facility so that all process water and water from maintenance activities is collected in a tank to be reused as "grey" water for non-critical purposes.
  • The company has built an education center that extends out over a nearby lake. This is used to educate the public on the efforts that Lakeside EFW is making toward a sustainable future.

Lakeside Education Centre
Lakeside Education Centre

For further information

Renewable Energy:
Waste to Energy

Industry:
Power

Products & Solutions:
CENTUM (Production Control Systems)
 ProSafe-RS (Safety Instrumented Systems)

行业

  • 可再生能源

    使用可再生能源可以保护环境,使社会和工业更接近实现可持续性发展的目标。然而与传统能源相比,在其快速发展的道路上存在着一些阻碍,如生产成本较高、电网供电不稳定等。作为控制系统和仪表行业的资深企业,横河电机一直致力于帮助各行业客户实现稳定运营、提高工厂生产效率。基于VigilantPlant实现卓越运营的理念,横河的解决方案可促进可再生能源的使用。

    更多
  • 垃圾发电

    垃圾处理在城市地区面临着日益严峻的挑战。垃圾发电(WTE)技术为这一问题提供了环保的解决方案,同时满足了对替代能源日益增长的需求。全世界150多个垃圾发电厂和其他类型的垃圾焚烧设施几乎都依赖于横河电机的控制系统解决方案。因此,横河电机的测量和控制技术在使我们的世界更清洁、更高效方面发挥着关键的基础设施作用。

    更多

相关产品&解决方案

  • SIS (SIL3) ProSafe-RS

    ProSafe-RS是获得德国认证机构(TÜV)认证的安全仪表系统,符合IEC 61508中指定的安全完整性等级(SIL)3。它已经在2400多个项目中安装使用,涵盖从大型集成过程自动化项目到独立解决方案等多种项目类型。

    更多
  • 安全仪表系统 (SIS)

    安全仪表系统 (SIS) 可保护人员、环境和资产。横河电机的SIS和相关安全解决方案被广泛应用于紧急停车、火灾与燃气、燃烧器管理和HIPPS等领域。

    更多
  • 集散控制系统(DCS)

    横河电机的集散控制系统(DCS) 可实现工业过程的自动化和控制,并提高业务绩效。30,000多套系统的经营者选择采用横河电机的DCS来实现其生产目标。

    更多

置顶
WeChat QR Code
横河电机(中国)有限公司