Yokogawa Provides CENTUM CS 3000 and Field Instruments for New FCC Facility

SK Energy logo
Download (593 KB)

Executive Summary

SK Energy, Ulsan, Korea
SK Energy, Ulsan, Korea

SK Energy is the energy and chemical affiliate of South Korea's SK Group. Korea's largest oil refiner (1.1 million barrels of daily refining capacity), SK Energy controls about 35% of Korea's fuel retailing market and operates 4,270 service stations. The firm is involved in oil exploration and production in 15 countries and has proven reserves of 500 million barrels of oil equivalent. SK Energy imports coal and liquid petroleum gas (LPG), and claims a 44% share of the Korean LPG market. The company supplies natural gas to Seoul and other cities in Korea, and also makes lubricants, low–pollutant gasoline, and petrochemicals.

SK Energy decided to construct a new fluid catalytic cracking (FCC) facility at its Ulsan refinery to convert bunker C oil into high quality, low sulfur, and high value-added refined liquid products such as gasoline and diesel. This decision was made for the following reasons:

  1. Respond to growing demand for cleaner burning distillate fuels and falling demand for residual fuels such as bunker C fuel oil due to stricter environmental regulations
  2. Increase gasoline output to meet growing demand through 2010
  3. Enhance the company's price competitiveness in the global fuel market
  4. Increase the complexity ratio of the Ulsan refinery, which is lower than that of the company's other refineries in South Korea

For this new FCC facility, SK Energy awarded Yokogawa Korea a contract to install a state-of-the art CENTUM CS 3000 distributed control system (DCS) and field instrumentation. Working on a very tight project schedule, Yokogawa Korea successfully completed all control system and instrumentation engineering and the new facility was able to launch production of commercial-grade products on schedule.

The Challenges and the Solutions

The overall project goals were identified during the feasibility study and project planning phases, and emphasized schedule, quality, cost, and safety.

A major challenge was the tight project schedule as SK Energy needed to complete construction of this new FCC plant in just 15 months and begin a pilot program of operational testing no later than mid 2008. Normally such plants take at least two years to complete and commission, and require another three months before they can be operating at full capacity.

After receiving this order in August 2006, Yokogawa Korea's project team worked closely with personnel from three different EPC companies, holding biweekly technical meetings to discuss and decide on hardware and software specifications.

For this new FCC project, more than 40 sub-system interface cards and a Modbus interface were utilized to integrate systems from 14 partner companies with the CENTUM CS 3000 DCS. This enabled status information and other types of data from compressors, blowers, filter systems, dryers, and a wide variety of other types of equipment to be transferred to the DCS and viewed by operators on various graphic displays at the human interface stations (HIS). By keeping constantly up to date on the status of all processes, the operators are able to easily analyze and understand the process situation and take action immediately. In addition, all production data gathered at the DCS can be transferred to higher level computer systems via an OPC interface. That data can be stored for the tracking of overall production efficiency and used for asset management analysis and other types of plant equipment studies. In these ways, integration contributes to visualization of all plant data, significantly reduces labor costs, and ensures safe plant operation.

The new central control room
The new central control room

Customer Satisfaction

In appreciation for its key contribution with the control system and instrumentation engineering, Yokogawa Korea was awarded a plaque by SK Energy. Following the successful completion of this project, other refiners (GS Caltex, Hyundai Oil Bank) have selected Yokogawa Korea as their technology partner.

J.W Park, Lead I&C Engineer of SK Energy, said, "Yokogawa worked collaboratively with our team through the many challenges of the FEED phase and subsequent design, build & test phases, delivering the system on time and completing preparations for the successful start-up and commissioning of this plant. Lessons have been learned which will benefit the management and planning of future projects. We commend Yokogawa for their open and honest acceptance of responsibility, support, and dedication, especially during the challenging installation, start-up, and commissioning of the plant."

Mr. Park went on to say, "SK Energy is always looking to make further improvements in its operations, and we are now considering how to improve the sustainability of our manufacturing operations. We have heating furnaces and boilers at our site and are looking for ways to save energy and reduce CO2 emissions by reducing flue gas oxygen concentrations. And for complex plant operations, we also are looking at operation support systems like Exapilot that will retain the expertise of our most expert operators and eliminate lost production. We see a great need for this function and believe it can lead to increased productivity. For these reasons, we would like to keep working together with Yokogawa Korea."

J.W Park of SK Energy
J.W Park of SK Energy

DCS: CENTUM CS 3000
I/O points: 21,500
Domains: 3
Engineering stations (EWS): 4
HIS: 43 (2 dual screens)
Field control stations (FCS): 20
Sub-system interface cards: 46
Field instruments: 1,500 EJA, 400 YTA, 800 PK200

Industries

  • Oil & Gas Downstream

    The oil & gas downstream industry has been facing an increasing number of challenges in recent years. These include the changing characteristics of the feedstock to be processed, aging of process facilities and equipment, rising cost of energy, lack of skilled plant operators who can run a refinery safely and efficiently, and the ever-changing requirements from both the market and the customer.

    Over the years, Yokogawa has partnered with many downstream companies to provide industrial solutions focused on solving these challenges and problems. Yokogawa's VigilantPlant solutions have helped plant owners to achieve maximum profitability and sustainable safety within their plants.

    See More
  • Refining

    In the ever changing marketplace, refineries are seen not only as crude processing units but also as profit centers. At the same time, there is a keen awareness of the need for safety at such facilities. A total production solution that encompasses planning, scheduling, management, and control is required to achieve long-term goals for profitability, efficiency, and environmental protection. With years of expertise in the automation field, Yokogawa can bring you affordable total solutions for improved operability and a cleaner world.

    See More

Related Products & Solutions

  • Distributed Control System (DCS)

    Our distributed control system (DCS) enables automation and control of industrial processes and enhanced business performance. Over 30,000 systems entrust Yokogawa DCS to deliver their production goals.

    See More

Top