PetroChina Dushanzi Refinery and Petrochemical Complex, Dushanzi, China

PTT Exploration and Production Plc., Thailand

- Highly Reliable Production Solution Using Yokogawa Automation and Safety Systems with FOUNDATION™ Fieldbus Technology.


- This is the first offshore platform in Thailand that is designed to make full use of FOUNDATION™ fieldbus technology.


Petroleum Development Oman, Oman
  • Petroleum Development Oman, Oman
  • Kauther Gas Plant and Gas Wellheads FOUNDATION™ fieldbus based Control System and Safety System
  •  - The plant was designed to be unmanned, except for some first-line maintenance personnel who are stationed at the plant.
  • - Through the use of the latest control system and FOUNDATION™ fieldbus technology supplied by Yokogawa, process control and the diagnostic monitoring of field instrumentation is done from remote locations.  

Scarab Saffron, Egypt
  • Scarab Saffron, Egypt
  • Scarab Saffron Gas Fields
    FOUNDATION™ Fieldbus Control System [Offshore]
  •  - Smooth fieldbus deployment through first-class project management and expertise

    - Reduced operating costs by utilizing the latest technology


Shell UK Exploration and Production, United Kingdom

- Minimized total cost of ownership and maximized total value of ownership



Nederlandse Aardolie Maatschappij, The Netherlands

FAST/TOOLS SCADA System- FAST/TOOLS SCADA system has helped NAM reduce its operational costs.

- By installing this onto the existing system, the ever greater data streams became easier to manage.

Top of this page

CNOOC and Shell Petrochemicals Company Ltd., China

Movement Automation System (MAS)Configured in CENTUM Production Control System[Petrochemical]

- All logistics of raw materials, intermediate products and final products are controlled and managed by MAS.

- MAS enables Operational Excellence with its seamless interface to enterprise resource planning system.

James River Power Plant, USA

Total Capacity of 253 MW, Coal and Gas Fired, System Replacement

- Replacement of legacy control system by CENTUM CS 3000

- Replacement of 4 – 20 mA protocol to FOUNDATION fieldbus™

Thai Acrylic Fibre Co., Ltd., Thailand

Acrylic Fiber PlantDigital plant control system based on FOUNDATION™ fieldbus

- 10-month commissioning realization

- About 20% reduction in CAPEX

- Plant efficiency and process capability improvements

 

 


Alexandria Fiber Company

- Completed this project at significantly lower cost

- Improved the quality of products coming off the production line and reduced the production cost by gaining timely access to field information

- Acquired a predictive maintenance capability through the use of device diagnostic data