- Home>
- Products & Solutions:
- Industrial Automation and Control Business:
- Success Stories:
- Power:
- PowerSeraya Ltd., Singapore:
- James River Power Plant, USA:
- Greater Toronto Airports Authority (GTAA), Canada:
- Kraftszer Kft., Hungary:
- ENECO Energie, The Netherlands:
- PNOC-EDC, Philippines:
- Eraring Power Station, Australia:
- Yonghung Thermal Power Plant (Unit 1 & 2), Korea:
- Tachibanawan Thermal Power Station, Japan>
- BBE & BBG Plants, Spain:
- Liddell Power Station, Australia:
- Itoigawa Power Plant, Japan:
- AGL Hallett Power Station, Australia:
- AGL Somerton Power Station, Australia:
- Tuas Power Station (Stage One), Singapore:
- The 4th Thermal Power Plant, Mongolia:
- Wallerawang Power Station, Australia:
- SC Electrocentrale Bucuresti SA, Romania:
- ENECO Energie, The Netherlands
Success Stories
ENECO Energie, The Netherlands
|
![]() |
Executive Summary
Replacement of outdated heat/CO2 transfer system

Greenhouse
ENECO Energie was looking to update its system for transferring heat and CO2 from a power station to greenhouses because
replacement parts were no longer available for its existing system and communications were frequently disrupted. Yokogawa
proposed a comprehensive and integrated system using STARDOM FCN/FCJ controllers as intelligent RTUs and a FAST/
TOOLS SCADA package. After evaluating the proposals submitted by several different system integrators, ENECO awarded
this project to Yokogawa for the following reasons, each of which helped minimize the total cost of ownership:
- Reduced cabling costs by using a commodity GPRS network infrastructure
- Additional reduction in system cost by making full use of existing components
- Reduction in cost of software by using all web-based technology
- Long-term service contract – no need to worry about a suspension of maintenance services
The customer is very happy with this updated system that employs state of the art technology.
About ENECO Energie
ENECO Energie is one of the three major energy companies in the Netherlands. The company provides an integrated range of services based on the transportation and supply of electricity, gas and heat, and associated services such as metering, installation and invoicing. In all, ENECO Energie serves some two million business and household customers.
Customer Endorsement

Mr. Ton van Koppen
“Yokogawa's proposal was based on the most complete and
integrated system, with all components highly matched to work
together.”
— Mr. Ton van Koppen of ENECO Energie
About the Project
The ROCA power station near Capelle a/d IJssel, The Netherlands, burns gas to generate electricity. The resulting heat and CO2 are essential to the growth and photosynthesis of plants. ENECO Energie built a pipeline network to transfer this heat and CO2 to the greenhouses of 138 market gardeners in the Bleiswijk district. To regulate the transfer of heat and CO2, STARDOM FCN autonomous controllers were installed in each greenhouse, and FAST/TOOLS was installed at the central control room in Rotterdam to perform data acquisition and remote monitoring and control.
The Challenges and the Solutions
Reduced Cabling Cost with a Commodity Network Infrastructure and GPRS

System Configuration
The deciding factor in opting for Yokogawa's solution was the use of GPRS for (TCP/IP) network communications between the local STARDOM controllers and FAST/TOOLS. Modern technology replaces the outmoded combination of telephone lines and fiber optic cables. Besides reducing the costs of cabling, this new method of communication is also much more reliable. “With the GPRS network, the error-proneness of the fixed lines have been eliminated. To enable communication with the GPRS network, the STARDOM controllers are each equipped with a mobile communication module. This then transmits the I/O's to the Rotterdam head office over the GPRS network.”– Mr. Van Koppen
Additional Reduction in System Cost by Making Full Use of Existing Components

Site Photo
The customer preferred to continue using existing cabinets, CO2 meters, and energy totalizers.
The STARDOM controllers fit perfectly in the cabinets and connected easily to this previously
installed equipment.
“Each site controller is installed in an existing cabinet, and controls both the heat (temperature
and supply) via a plate heat exchanger, and the CO2”, explains Mr. Van Koppen.
Reduction in Cost of Software by Using all Web-based Technology

ENECO Web Site
The FAST/TOOLS package that performs data acquisition and control functions
from the central control room features a web-based implementation that enables
a standard browser to be used as the control system interface. FAST/TOOLS also
provides a link to the ENECO website. The market gardeners can make heat and
CO2 settings and view a number of parameters via the Internet. No specialized
software is required on their PCs, so there is no need to worry about software
maintenance.
“The growers can login to our site via the Internet, so that they can view a number
of important parameters related to the functioning of their own delivery station.”
–Mr. Van Koppen.
Long-term Reliability – No Need to Worry About Maintenance
The ENECO Energie heat and CO2 network is a typical small-scale process that calls for an off-the-shelf industrial automation system with fast-track implementation. Although the project was quickly implemented, Yokogawa was able as a system solution provider to guarantee a long-term service contract to this customer.
|
SCADA: FAST/TOOLS |
| Intelligent RTU: 138 STARDOM FCN autonomous controllers |