Executive Summary
Replacement of outdated heat/CO2 transfer system
Greenhouse
ENECO Energie was looking to update its system for transferring heat and CO2 from a power station to greenhouses because replacement parts were no longer available for its existing system and communications were frequently disrupted. Yokogawa proposed a comprehensive and integrated system using STARDOM FCN/FCJ controllers as intelligent RTUs and a FAST/ TOOLS SCADA package. After evaluating the proposals submitted by several different system integrators, ENECO awarded this project to Yokogawa for the following reasons, each of which helped minimize the total cost of ownership:
- Reduced cabling costs by using a commodity GPRS network infrastructure
- Additional reduction in system cost by making full use of existing components
- Reduction in cost of software by using all web-based technology
- Long-term service contract – no need to worry about a suspension of maintenance services
The customer is very happy with this updated system that employs state of the art technology.
About ENECO Energie
ENECO Energie is one of the three major energy companies in the Netherlands. The company provides an integrated range of services based on the transportation and supply of electricity, gas and heat, and associated services such as metering, installation and invoicing. In all, ENECO Energie serves some two million business and household customers.
Customer Endorsement
"Yokogawa's proposal was based on the most complete and integrated system, with all components highly matched to work together."
— Mr. Ton van Koppen of ENECO Energie
Mr. Ton van Koppen
About the Project
The ROCA power station near Capelle a/d IJssel, The Netherlands, burns gas to generate electricity. The resulting heat and CO2 are essential to the growth and photosynthesis of plants. ENECO Energie built a pipeline network to transfer this heat and CO2 to the greenhouses of 138 market gardeners in the Bleiswijk district. To regulate the transfer of heat and CO2, STARDOM FCN autonomous controllers were installed in each greenhouse, and FAST/TOOLS was installed at the central control room in Rotterdam to perform data acquisition and remote monitoring and control.
The Challenges and the Solutions
Reduced Cabling Cost with a Commodity Network Infrastructure and GPRS
System Configuration
The deciding factor in opting for Yokogawa's solution was the use of GPRS for (TCP/IP) network communications between the local STARDOM controllers and FAST/TOOLS. Modern technology replaces the outmoded combination of telephone lines and fiber optic cables. Besides reducing the costs of cabling, this new method of communication is also much more reliable.
"With the GPRS network, the error-proneness of the fixed lines have been eliminated. To enable communication with the GPRS network, the STARDOM controllers are each equipped with a mobile communication module. This then transmits the I/O's to the Rotterdam head office over the GPRS network."
– Mr. Van Koppen
Additional Reduction in System Cost by Making Full Use of Existing Components
The customer preferred to continue using existing cabinets, CO2 meters, and energy totalizers. The STARDOM controllers fit perfectly in the cabinets and connected easily to this previously installed equipment. "Each site controller is installed in an existing cabinet, and controls both the heat (temperature and supply) via a plate heat exchanger, and the CO2", explains Mr. Van Koppen.
Site Photo
Reduction in Cost of Software by Using all Web-based Technology
The FAST/TOOLS package that performs data acquisition and control functions from the central control room features a web-based implementation that enables a standard browser to be used as the control system interface. FAST/TOOLS also provides a link to the ENECO website. The market gardeners can make heat and CO2 settings and view a number of parameters via the Internet. No specialized software is required on their PCs, so there is no need to worry about software maintenance.
"The growers can login to our site via the Internet, so that they can view a number of important parameters related to the functioning of their own delivery station."
–Mr. Van Koppen.
ENECO Web Site
Long-term Reliability – No Need to Worry About Maintenance
The ENECO Energie heat and CO2 network is a typical small-scale process that calls for an off-the-shelf industrial automation system with fast-track implementation. Although the project was quickly implemented, Yokogawa was able as a system solution provider to guarantee a long-term service contract to this customer.
<System delivered>
SCADA: FAST/TOOLS
Intelligent RTU: 138 STARDOM FCN autonomous controllers
<Related Article>
If you would like to know more about the ENECO project from the application point of view, please refer to the ENECO Energie application note.
Industrien
-
Cogeneration
Cogeneration or combined heat and power (CHP) is an efficient approach to generating power and thermal energy from a single fuel source.
-
Power
In the mid 1970s, Yokogawa entered the power business with the release of the EBS Electric Control System. Since then, Yokogawa has steadfastly continued with the development of our technologies and capabilities for providing the best services and solutions to our customers worldwide.
Yokogawa has operated the global power solutions network to play a more active role in the dynamic global power market. This has allowed closer teamwork within Yokogawa, bringing together our global resources and industry know-how. Yokogawa's power industry experts work together to bring each customer the solution that best suits their sophisticated requirements.
Zugehörige Produkte & Lösungen
-
Autonomer Regler (FCN-500)
Hohe Zuverlässigkeit und Schnelligkeit sind wesentlich für die Systeme, die Ihre kritischen Prozesse steuern. Das duale redundante Konzept der autonomen Regelung FCN (Field Control Node) stellt sicher, dass diese Prozesse unterbrechungsfrei weiterlaufen, selbst wenn ein Modul ausgetauscht wird.
-
Autonomer Regler mit niedrigem Energieverbrauch (FCN-RTU)
Das Modell der autonomen Regelung FCN (Field Control Node) mit niedrigem Energieverbrauch erfüllt die hohen Anforderungen abgelegener Standorte mit fehlender Stromversorgung.
-
Prozessleit-SPS/RTU
Von Prozessanlagen bis zu dezentralen Standorten – unsere Prozessleit-SPS und Remote Terminal Unit (RTU) verhilft Benutzern zu maximaler betrieblicher Leistung.