Executive Summary
Thai Solar Energy Public Company (TSE) recognizes the importance of providing clean, stable and sustainable power through a mixed portfolio of conventional and renewable energies to meet the increasing power market demand. Since its establishment in 2008, the company has set the target of becoming a world-class regional leader in providing renewable energy through reliable leading-edge technologies to serve the needs of both industry and society.
TSE aims to establish a solid foothold in the solar power industry while delivering other renewable solutions not only in Thailand but also internationally, specifically in Asia and Oceania. As of today, TSE has a total power production capacity of over 145 MW in Thailand, which consists of a mixed energy production portfolio of 16 solar photovoltaics (PV) utility plants, 14 solar PV rooftop projects, 3 biomass power plants and the most recently built floating solar PV plant in Prachinburi Province, which commenced commercial operation on May 25, 2021. This floating solar project is the company's first private pilot project with an installed capacity of 8 MW peak (MWp). The total project area exceeds 11 hectares with an investment value of over 200 million THB (approx. 5.95 million USD).
Project Outline
Hitachi Consumer Products (Thailand), Ltd., the end-user of the electricity from the PV plant, operates various industrial plants in a broad range of businesses such as agriculture, food, and consumer products, and these process plants are usually equipped with water supply storage ponds, cooling ponds and wastewater treatment ponds. Seeing the opportunity to maximize usage of the pond surfaces by adopting a floating solar power plant for clean power production, TSE proposed its floating solar plant, which is designed to produce 8 MWp of clean power for use at Hitachi’s factories. The idea was readily accepted, and both companies concluded a 25-year private power purchase agreement (private PPA).
The TSE floating solar PV project makes the most of the ponds within the factory sites which supply water for plant production, by generating clean electricity using photovoltaic technology, thus adding value. Moreover, this hybrid utility setup has the further benefit that the pond water can be used to remove the excess heat generated on the surface of the solar panels.
At present, the project can produce peak power of 6.475 MWAC. With the installation of 16,492 monobifacial PV modules with power capacity of 8.081 MWp in two ponds with an area of 57,094 m2, annual power generation is 12.54 GWh, or an average of 34,356 kWh/day.
TSE's floating solar PV project, a collaborative partnership between private companies to produce solar power on water surfaces, is closely aligned with the country’s renewable initiative to promote clean energy and sustainable energy for the country.
This is TSE’s first floating solar project connected to a private grid in collaboration with Hitachi. TSE aims to expand its solar power business expertise and build more solar plants to feed power exclusively to private companies in conjunction with the national policy of supporting environmentally friendly and energy efficiency initiatives.
Outline of Supply
Yokogawa CI Server is installed to monitor and control the solar power production facility including the substation and major equipment such as inverters, meters, weather stations, and motor protection relays (MDB), and to manage the “Zero Export” function to the grid.
Zero export is a common control function for private grid type solar projects whereby PV energy is 100% consumed exclusively by the off-taker with 0% limitation on active power feed-in to the grid. The CI Server-based monitoring and control system is engineered to control active power generation in reaction to active load changes so as to minimize power leaks to the transmission line that could cause power trips. The CI Server system is also equipped with comprehensive monitoring functions including automatic daily alarms and alerts via email, switchgear on-off control and performance ratio calculations.
The FA-M3 controllers used in this project are provided with two types of CPU: the new e-RT3 CPU runs Python scripts for the communication link to the CI Server; and the standard CPU is used to connect hardwired discrete inputs/outputs for status monitoring and sequence control.
The Challenges and the Solutions
TSE faced the intermittent power supply profile of solar power generation which did not match the load profiles, causing frequent power trips and reductions in plant efficiency. Yokogawa Thailand proposed to implement a new CPU-based Python-programmable PLC to communicate with inverters and meters to collect data from the field and deliver it to the supervisory control and data acquisition system (SCADA, now the CI Server is used). Communication in Python enables more stable and quicker data retrieval compared to Modbus communication. Besides, the included sequence CPU enables inverter data processing and executes power limit calculations.
The total power consumption of the plants of Hitachi Consumer Products (Thailand), Ltd. is estimated to be 10 MW during working days (Monday to Friday). The floating solar site is expected to generate 8 MWp of that 10 MW load, with the remaining 2 MW to be supplied by the national grid.
During commissioning, however, Yokogawa’s commissioning team found that on Sundays when the factories are closed, and from 11:00 am to 2:00 pm during the lunch break on working days, the power consumption falls to 2 MW. During these periods, power generation far exceeds power demand, resulting in excess power flow on the transmission line and causing the circuit breaker to trip frequently. As a result, TSE was losing the opportunity to sell electricity to Hitachi during those trips, making the solar power plant less efficient.
Immediately after advising TSE of this challenge, Yokogawa Thailand worked closely with TSE and the engineering, procurement and construction contractor (EPC) to add an algorithm for tuning the inverters as quickly as needed to prevent tripping of the breaker. Yokogawa FA-M3 and e-RT3 enabled stable two-way data communication, quick ramp rate tuning, and swift response to inverters, helping to optimize plant operation and increase plant efficiency.
Customer Satisfaction
Yokogawa Thailand and the EPC made the right approach by focusing on solving problems and optimizing operations. The solution has helped eliminate the customer’s problem of frequent power trips that lowered the plant efficiency.
Yokogawa Thailand and the EPC got involved in this project from the initial phase, and planned and worked on the project specifications and design together with TSE. This helped Yokogawa comprehend the project goal from the customer’s perspective and provide an appropriate solution tailored to the customer’s needs. Our solution packaged with CI Server and FA-M3 controllers running Python enables stable two-way data communication and quick tuning and control of inverters, thus minimizing power trips and indirectly improving plant operation efficiency. Yokogawa Thailand is committed to providing reliable remote engineering support from Bangkok to ensure that TSE does not lose opportunities to sell electricity to end-users.
With such commitment and mutual understanding, TSE is very satisfied with Yokogawa products and services and intends to continue working with Yokogawa and the EPC for the upcoming 1 MW solar plant expansion involving a SCADA for monitoring, control, and engineering for integrating the upper system of the existing floating solar plants.
Project Overview
Customer | ENSYS Co., Ltd. |
---|---|
Owner | Thai Solar Energy Public Company Limited (TSE) |
Plant type | Floating solar PV |
Capacity | 8 MW |
Project type | Grassroot new project |
Scope | Collaborative Information (CI) Server,FA-M3 PLCs |
Industrias
-
Power
In the mid 1970s, Yokogawa entered the power business with the release of the EBS Electric Control System. Since then, Yokogawa has steadfastly continued with the development of our technologies and capabilities for providing the best services and solutions to our customers worldwide.
Yokogawa has operated the global power solutions network to play a more active role in the dynamic global power market. This has allowed closer teamwork within Yokogawa, bringing together our global resources and industry know-how. Yokogawa's power industry experts work together to bring each customer the solution that best suits their sophisticated requirements.
-
Renewable Energy
Renewable energy helps protect the environment and brings both society and industry closer to the goal of achieving sustainability. However, compared to conventional energy sources, there are certain challenges that stand in the way of its rapid adoption, such as higher production costs and greater instability in the supply of power to the grid. As a leading company in the control and instrumentation business, Yokogawa has always striven to help its customers in various industries achieve stable operations and improve productivity in their plants. We provide solutions for renewable energy applications worldwide, thus contributing to the sustainable development goals.
-
Solar Power
The sun is an inexhaustible source of clean energy, and humans have used this in a variety of ways down through the ages. Today, solar power generation is a topic of considerable interest all over the world. With more than 100 years of control experience, Yokogawa now offers a fully integrated control and monitoring solution for solar PV and CSP power plants.
Productos y Soluciones Relacionadas
-
Collaborative Information Server(SCADA)
Collaborative Information Server (CI Server) allows immediate improvement to production efficiency through DX (digital transformation) and reduction of operational maintenance whilst building a digital transformation framework.
-
FA-M3
Featuring ultra high-speed, stable control, link functions and improved network performance, the FA-M3V controller is created by improving every aspect to deliver stable control at the highest speeds.