Should I set the UPM101 CT ratio to the CT ratio of the existing CT?

After attaching the supplied dedicated CT, the CT ratio of the UPM101 should be set considering the CT ratio of the existing CT.
For example, if the existing CT is 200A/5A, the CT ratio setting is "40".

Related Products & Solutions

  • UPM100/UPM101

    UPM100 / UPM101 is a compact power monitor that can measure 15 items such as electricity energy with 1 unit.


Top