Executive Summary

Yonghung Thermal Power Plant, Korea (800MW x 2)
Yonghung Thermal Power Plant, Korea (800MW x 2)

Faster, smoother plant commissioning
The customer has successfully brought online a greenfield 800 MW supercritical power plant, using a Yokogawa full-replica plant simulator to ensure a fast and smooth plant commissioning process.

The full replica plant simulator was used for:

  • Control system validation prior to DCS commissioning
  • Operator training.

Background

In Korea, steadily growing demand for electricity together with limited indigenous energy resources and a heightened environmental awareness have required additional power generation facilities with improved efficiency and environmental performance. Korea South East Power Co., Ltd. (KOSEP), a wholly owned subsidiary of the government-owned Korean Electric Power Company, constructed two new 800 MW supercritical coal-fired units in Yonghung, Korea to generate highly-efficient, environmentally-friendly electricity.

The Challenges and the Results

To ensure that the commissioning process for its new plant went smoothly, KOSEP turned to Yokogawa and its TechComm Simulation subsidiary for a full-replica training simulator solution.

The purpose of this full-replica training simulator was twofold:

  • To conduct a thorough, off-line test and validation of the DCS configuration prior to the control system's actual loading and commissioning at the plant.
  • To aid in the initial/refresher training of plant operators, which was conducted in parallel with DCS commissioning.

To achieve these objectives, the simulator was required to fully simulate DCS functions and emulate turbine, generator, and electrical control functions. Yokogawa's full-replica simulator met the customer's requirements with high accuracy (> 99% steady state; >95% dynamic state), calculation of models at less than 250msec per cycle, and the ability to perform performance tests and a wide variety of simulations including startups, shutdowns, and load changes under normal, abnormal, and emergency operating conditions.

Thorough off-line control validation

The simulator was delivered on-schedule to the site in September 2002, twelve months before the boiler was to be fired up for the first time. In collaboration with the DCS manufacturer and TechComm, the customer proceeded to test and validate the DCS configuration on the simulator, conducting an I/O checkout, drive checks, sequence checks, control module checks/tuning, alarm/trip setting, and DCS response checks as well as tests in which malfunctions and other abnormal situations were simulated. This enabled thorough validation of the control configuration prior to DCS installation at the site, thereby minimizing the final tuning work. A significant number of potential plant trips and situations where there was potential for damage to the plant were identified and resolved before the initial plant startup, ensuring a safe and smooth plant commissioning process.

Custom-made operator training

The thorough control system validation on the simulator also provided a suitable training environment for plant operators. The simulator aided in the initial training for plant operators and refresher training for experienced operators under a wide variety of normal, abnormal, and emergency operating conditions. In parallel with DCS commissioning, KOPEC plant operators were well trained under the new control environment, reproducing custom-made flexible operating scenarios on the simulator. This avoided mistakes that could have occurred if the operator had not been familiar with the new system, thereby ensuring safe and smooth plant operation.

The simulator also has the flexibility and expandability to accommodate future improvements in plant performance. The simulator continues to be an effective tool for the customer to optimize operational procedures and the plant logic/system.

Central control room

Central control room

Power Plant Simulator

Power Plant Simulator

Yonghung Thermal Power Plant (Unit 1 and 2)
Owner: Korea South East Power Co., Ltd. (KOSEP)
Output: 2 x 880 MW
Plant efficiency: 43.5%
Operation mode: base load & cycle operation
Fuel: bituminous coal
Boiler: supercritical pressure, once through, single reheat
Turbine: tandem compound, HP, IP, and LP turbine, single stage reheat, condensing type
Generator: cylindrical rotor, hydrogen and water cooled, three-phase synchronous generator
Simulator system: TechComm full-replica plant simulator (main computer + instructor system + DCS)

相關業種

  • 電力

    1970 年代中期,Yokogawa 隨著 EBS 電力控制系統的推出,正式投入電力產業。此後,Yokogawa 持續深化相關技術與能力的研發,致力於為全球客戶提供最佳的服務與解決方案。

    為在瞬息萬變的全球電力市場中發揮更積極的角色,Yokogawa 建立並營運全球電力解決方案網絡,強化集團內部的協同合作,整合全球資源與產業專業。Yokogawa 的電力產業專家攜手合作,為每一位客戶量身打造最符合其高度專業需求的解決方案。

  • 火力發電

    以煤、石油或天然氣為燃料的火力發電,至今仍占全球發電量的大宗。

相關產品&解決方案

  • 分散式控制系統(DCS)

    我們的分散式控制系統 (DCS) 可自動化和控制製程,提高績效。 已經超過 10,000 家工廠利用Yokogawa DCS 實現生產目標。


定頂