Executive Summary

Nederlandse Aardolie Maatschappij BV (NAM) , Groningen, The NetherlandsAs with most European countries, natural gas is a critical source of energy for the Netherlands. And most conveniently for the 16 million Dutch people, an abundant annual supply, 32 billion cubic meters, is located in Groningen province, in the far northeastern corner of the country. This rich gas field began producing in the 1960s. Since then, the inevitable depletion of resources and aging of equipment as well as stricter environmental regulations have required a massive upgrading of facilities. Nederlandse Aardolie Maatschappij BV (NAM), the Dutch petroleum company (a joint venture of Shell and Exxon) that oversees the project, began working on the upgrade in 1997. NAM realized that the days of "free flow" were gone, and like most other oil and gas companies around the world, a great deal of additional effort would be required to continue production.

The most urgent need has been to boost the gas pressure. Nearly 40 years of production have depleted the source by half, reducing the wellhead pressure to 90 bar. About 30 bar is lost through dehydration and the removal of impurities, which leaves 60 for transmission. Since this is the threshold value for gas distribution, NAM engineers know that if they are going to be supplying in the year 2040 and beyond, it will have to be done with gas compression equipment.

Another great need is to stabilize gas supply for customers' varying needs. During the warm summer months, the Dutch demand a modest 50 million cubic meters from Groningen. But on a cold winter day, they may ask for 250! On any given day, the demand may swing by as much as 3:1. To handle these wide changes in demand, NAM is planning to reconstruct huge underground storage facilities, one kilometer below the surface, to act as a buffer for the gas supply.

One of the 20 gas well clusters in Groningen province
One of the 20 gas well clusters in Groningen province

The Challenges and the Solutions

As one would expect, an engineering project of this scale cannot be handled by a single company, no matter how large. Stork GLT, a five-company consortium that included Yokogawa Europe as instrumentation and control system provider, was formed in 1997 and spent the next 12 years renovating the clusters. With that work now done, NAM has signed up for about another 15 years with the consortium, which is now called GLT-PLUS, for additional renovations and plant maintenance.

The gas wells are organized into 20 clusters, each consisting of wells and a treatment plant. Each cluster has a control room that normally operates unmanned, automatically, under the supervision of the central control room. Many types of field instruments are utilized in each cluster, and NAM needs to remotely monitor these devices and organize their maintenance schedule. NAM always uses the latest technology to improve operations and productivity.

Central control room

Central control room

DTM device status window

DTM device status window

Yokogawa's Plant Resource Manager (PRM) software is the backbone for all maintenance operations. The combination of FOUNDATION™ fieldbus networking technology, combined with the use of DTMs and the PRM software make it possible for the engineers to keep track of thousands of valves and instruments. In many cases, when problems arise, the maintenance engineers can use DTMs to get a quick picture of what is happening with the equipment.

Work orders are prepared each day, and maintenance engineers meet the next morning with operations personnel to discuss needs and priorities. The close collaboration means there are few, if any, surprises. And so, the maintenance department, thanks to powerful tools like DTMs, is beginning to change from "corrective" mode to "proactive" mode. The intelligent instruments and the database infrastructure make this happen. There is still a learning curve, but the engineers are starting to work through it.

DTMs can collect and organize hundreds of instrument parameters and diagnostics and make them available in comprehensible form for maintenance engineers. With thousands of instruments spread over a very wide area, this plays a crucial role in making sure that everything runs smoothly in the gas field.

Customer Satisfaction

Ron Schoemaker, Yokogawa's representative within the GLT-PLUS consortium, said, "The complete field is controlled by a Yokogawa CENTUM VP system, the largest field-wide DCS in the world. It presently supervises about 800,000 tags, and when the underground storage facilities are connected to the field-wide DCS, the tag count will be close to one million. The gas field is automated to the degree that, theoretically, one man could run the entire operation. In practice, NAM keeps two men in the control room."

Mr. Schoemaker went on to say, "When we started, fieldbus was too new for us to consider using it, but the concept of predictive maintenance appealed to the team, and so the first 13 clusters were done with standard HART instruments, in a "quasi fieldbus" of sorts. Yokogawa's field controllers are connected to the central control system by using a dedicated fiber optic network."

Robin de Vries, a Yokogawa plant asset expert, said, "It was the first one equipped with FOUNDATION fieldbus technology on a pilot basis, in 2004, and has 25 FOUNDATION fieldbus devices in four segments. Now there are 2,500 intelligent instruments connected with FOUNDATION fieldbus and 8,000 with HART. Most of them are Yokogawa instruments for pressure, mass flow, temperature, and conductivity. But standardized instrumentation buses make it easy to connect other manufacturer's devices, and so there is a scattering of Magnetrol and Endress+Hauser level instrumentation and Emerson valve positioners."

Ron Schoemaker, Yokogawa Europe representative within the GLT-PLUS consortium

Ron Schoemaker
Yokogawa Europe representative within the GLT-PLUS consortium

Robin de Vries, Plant Asset Expert for Yokogawa Europe

Robin de Vries
Plant Asset Expert for Yokogawa Europe

 

產業別

  • 上游

    上游業包含海上和陸上活動,包括井口自動化,分餾,完井和分離,回收和製備地下或水下原油和天然氣。

    當石油被帶到地表時,在運輸之前必須將其分離。在三相分離中,一級和二級分離階段通常分佈有氣體流量,水流量和油流量,氣體的輸送需要管道,並且在輸送之前的上游階段需要進行分餾。液體需要通過罐和管道輸送並處理,這就需要精確的液位測量。

    更多

相關產品&解決方案

  • 工廠資源管理系統 (PRM)

    設備需要經過適當管理才能實現高可靠性和穩定的工廠運營。 PRM能幫助提升維護計劃的品質,並在整個工廠生命週期內將維護成本最佳化。

     

    更多
  • 分散式控制系統(DCS)

    我們的分散式控制系統 (DCS) 可自動化和控制製程,提高績效。 已經超過 10,000 家工廠利用Yokogawa DCS 實現生產目標。

    更多

置頂