Energy Monitoring for Manufacturing Lines

Overview

MW100 and PR300 system measures and quantifies the electrical energy consumption for each assembly line.

Application keys

  • Scalable from a single node to hundreds of locations
  • Cost effective Individual electrical monitoring for many areas
  • Demand monitoring with alarm output for load shedding
 Energy Monitoring for Manufacturing Lines
 

Benefits of using MW100/PR300

  • On demand data recording/monitoring with easy access
  • Easy connection with MW100/PR300
  • Available with serial or Ethernet communications
  • Remote monitoring from any PC with internet connection

行业

×

Have Questions?

Contact a Yokogawa Expert to learn how we can help you solve your challenges.

置顶
WeChat QR Code
横河电机(中国)有限公司
WeChat Recruiting QR Code
横河电机中国招聘