Introduction

Photo 1

The discharge of improperly treated industrial chemicals and fuel gas can have a major impact on the environment, posing a serious threat to public health. Concurrent with the global growth of manufacturing operations to keep pace with market trends, many countries are taking measures to deal with environmental problems. In Japan, for instance, the Air Pollution Control Law and the Water Pollution Control Law require businesses to control toxic emissions. Both are revised periodically. To comply with government regulations and fulfill their responsibilities to society, businesses are upgrading their monitoring and control of waste treatment utilities, including waste water treatment and dust filtering facilities.

Effluent control in Japan

Closed bodies of water such as lakes, inland seas, and bays where there is relatively little inflow or outflow are particularly vulnerable to water pollution. Eutrophication caused by organic pollution can lead to problems such as massive plankton outbreaks and red tides. With the implementation in 2001 of the fifth stage of the Japanese Total Pollutant Load Control Program, chemical oxygen demand (COD) restrictions were enhanced. In addition, nitrogen and phosphorus were added to the list of controlled substances as they are believed to be a cause of red tides.

Air pollution control in Japan

Respiratory function can be affected by suspended particulate matter. Volatile organic compounds (VOC), which were once widely used as cleaning agents in the manufacturing of semiconductors and other electric and electronic devices, are thought to play a role in generating photochemical oxidants. The Japanese government placed restrictions on VOC in 2004 when it revised the Air Pollution Control Law.

 

Expected Benefits

Industrial Effluents

The waste treatment facilities and main plants integration, achieved with the new "Integrated Operation" system architecture, contributes toward the reduction of factory related pollution with following benefits:

Blind spots eliminated

When utility data is displayed on multiple instruments and/or recorders, blind spots can occur in utility monitoring. By bringing together this utility data in the STARDOM FCN/FCJ hybrid PLCs, this data together with other plant status information can be monitored and manipulated from the DCS HMI. This eliminates blind spots.

Reduced risk of uncontrolled discharge of industrial effluents

From the central control room, which is manned around the clock, personnel operate and control the whole plant from the Distributed Control System (DCS) Human Machine Interface (HMI). By integrating into the DCS HMI the data and alarms from utilities, which are often monitored independently, the probability of an uncontrolled discharge of industrial effluents into a river is dramatically reduced. This also makes it possible to reduce the frequency of on-site patrols.

Agile action to the frequent utility revamps

In a new plant, the utility data can be integrated in the DCS HMI. Whenever utilities are revamped, the hybrid PLC logic needs to be modified. Although these changes can affect the operation of the DCS controllers, which handle the main process, no changes are made to the DCS logic. Modifying the DCS logic is not the solution to this problem. With an integrated operation architecture, the DCS logic does not need to be modified. The hybrid PLC data that has been modified as a result of the utility revamps can be accessed by the DCS via the System Integration OPC Station (SIOS). This enables the hybrid PLC data to be handled in the same way as the data from the DCS function blocks.

Reduced capital expenditure (CAPEX) for utility revamps

Each time utilities are revamped, rewiring and re-engineering of the DCS controllers is required. This new architecture eliminates the need to rewire the DCS controller and modify its logic, reducing the overall cost of a utility revamp. This is made possible by the SIOS, which allows the hybrid PLC function ownership due to longer sensor prove life-time.

Reduced training time

Every time a new system is installed, personnel must undergo training to learn how to operate it. With the integrated operation architecture, this is not necessary because there is no change in how the data and alarms from the FCN/JCJ hybrid PLCs are handled from the DCS HMI. Also, the automatically generated FCN/FCJ tuning windows have the same look and feel as the DCS tuning windows.

 

Process Description

Monitoring and Control Systems for Waste Treatment Utility

Monitoring and control systems for waste treatment utility

For waste treatment facilities to comply with stricter regulations and operate safely and efficiently, monitoring and control systems with the following characteristics are required:

  • Can flexibly accommodate regulatory changes in monitoring subjects and limit values
  • Monitoring and control points can be easily added at each process step
  • The monitoring and control system can cope in real time with emergencies such as the discharge of toxic effluents into a river in a remote location.
  • Seamlessly integrates with a centralized monitoring and control system, enabling integration of utility and production processes
  • Can operate with high reliability and stability for long periods of time
 

Challenge of Conventional Monitoring and Control Systems

Existing waste treatment utilities employ the following systems, depending on the facility scale and the treatment complexity.

On-site monitoring

Operation and monitoring with on-site instruments

Instruments are installed on-site. Single-loop controllers and the like perform control as well as operation and monitoring functions, and data are stored on recorders. This system is employed with utilities located in remote locations, and requires regular site patrols.

  • Relying chiefly on periodic on-site patrols does not allow real-time responses to emergency alarms.
  • The inability to operate in real time makes it difficult to control the utility if the emergency level is raised.
  • Readings are displayed on multiple instruments or panels, making oversights more likely.
  • Data displayed on different panels cannot be integrated at a central location.

Control through PLC and operation and monitoring with on-site displays

The system is located far from the main plant and thus performs control and monitoring independently. On-site personnel or periodic patrols are available.

  • When unattended, the system cannot respond to emergency alarms in real time.
  • When there are multiple utilities, their statuses cannot be centrally controlled.
  • Integrated management of the main and utility processes is not possible.

Centralized monitoring

Control through PLC and operation and monitoring on a DCS via data integration using Modbus or other method

Control is localized within the utility and only important data are collected and monitored from the centralized monitoring and control system.

  • To comply with stricter regulations and accommodate data from an increased number of monitoring points, the DCS controller logic needs to be modified.

Control, monitoring, and operation all performed on a DCS using remote I/O

Measurements for all monitoring points are input to the DCS. As both monitoring and control are performed the centralized system, the operator can make real-time responses to changes in the utility status.

  • Changes to monitoring points and the utility's control logic require modification of the DCS logic.
  • Control of both main and utility processes requires more complex DCS logic.
  • The utility logic places a heavy demand on DCS resources CPU and I/O points.
 

Solution

System ConfigurationThe Yokogawa solution: Integrated operation

Same look and feel operation and monitoring on the DCS HMI

To overcome the limitations of conventional utility systems, Yokogawa proposes a new utility monitoring and control system architecture that seamlessly integrates hybrid PLCs with the DCS. The new system architecture can flexibly accommodate changes made to improve the operational efficiency of utilities.

Via a system integration OPC station (SIOS), the function blocks of the hybrid PLCs (FCN/FCJ controllers) can be operated and monitored from the DCS human-machine interface (HMI), and the display of data from both systems has the same look and feel. And with the Consolidated Alarm Management System for HIS (CAMS for HIS), all alarm management is integrated. Both the data and the alarms from the FCN/FCJ are integrated into the DCS HMI.

No change to the DCS system architecture

The monitoring and control of utilities by the FCN/FCJ controllers can be integrated into the DCS without having to change the DCS system logic or architecture. This is because the data from the FCN/FCJ hybrid PLCs passes through the SIOS, enabling it to be handled in the same way as the data from the DCS function blocks.

Automatic creation of tuning windows

Tuning windows for the hybrid PLC function blocks are automatically created in the DCS HMI. Specially adapted tuning windows for these function blocks are not required. 

Conclusion

There is an increasing need for a DCS with the ultra-high reliability required by plants. At the same time, the ability to raise productivity by flexibly improving and expanding subsidiary facilities and utilities is required. Distributing the facility and utility monitoring and control logic among the hybrid PLCs facilitates plant expansion and improvement, but with a conventional distributed system the DCS logic must be modified.

Yokogawa proposes SIOS-based integrated operation for the same look & feel display of hybrid PLC function blocks on the DCS HMI. The ability to access the hybrid PLC function blocks in the DCS HMI makes possible the automatic generation of tuning windows and trend windows, substantially improving engineering efficiency. Through the seamless integration of independent utilities in a centralized monitoring and control system, an entire plant can be monitored and operated in real time from the DCS HMI, increasing the utilities' efficiency and operational safety.

產業別

  • 化工

    化工廠依靠連續和批量的生產製程,每個生產製程對控制系統都有不同的要求。連續的製程需要一個強大而穩定的控制系統,該系統不能因為自身失效而導致生產線關閉;批量製程的重點在於擁有一個可以靈活調整公式程序的控制系統。兩種系統都需要在產品質量記錄中進行管理,並且能夠執行非常規操作。橫河電機憑借廣泛的產品組合、經驗豐富的系統工程師、遍及全球的銷售和服務網絡,為每個工廠流程提供解決方案。

    更多
  • 採礦和金屬

    採礦作業是從地球上生產出有價值的礦產或地質材料。經濟成本的回收通常需要高產量和高可用性的流程,保持低成本運營,嚴格保證安全性並遵守環保法規。

    更多
  • 水和廢水

    橫河電機通製開發更節能的技術,幫助減少運營的碳排放,以及構建保護環境免受污染的堅固建築,為可持續水生產提供控制解決方案。橫河憑借先進的技術和廣泛的應用專業知識與客戶合作,提供可持續水生產的解決方案,促進客戶的業務,並讓整個工廠在生命周期中增加價值。橫河的技術和產品可提高工廠的性能,確保它們在當今的水處理領域中具有競爭力,並降低運營成本。橫河支持市政和工業水處理領域的各種水控制方面的應用。

    更多
  • 特種和精細化工

    橫河電機長期以來一直為特種和精細化工的客戶提供服務。我們擁有可為您提供卓越可靠性和靈活性的批量解決方案,同時我們還有在設計批量解決方案時可應對各種複雜要求的行業專家。我們承諾與橫河電機的合作夥伴關系期間,確保您能夠在保證安全和遵從法規的前提下,生產滿足客戶需求的產品。

    更多
  • 製藥

    能否充分利用大型新興市場的機遇,是目前製藥行業面臨的重大挑戰。現在製藥公司比以往任何時候都更需要導入精益化生產技術,以提高盈利能力。作為全球知名工業自動化供應商,橫河電機致力於為客戶的優化生產實踐提供卓越的解決方案。

    更多
  • 造紙

    面對不斷變化的市場需求,造紙行業的競爭也愈演愈烈。橫河電機可以幫助節能工廠實現全球可持續性發展。

    更多
  • 鋼鐵

    在鋼鐵工業中,不僅要提高產品質量,而且要提高制造和運營技術,解決環境問題、提高能源效率。橫河幫助客戶創造理想的工廠,並與客戶共同成長。

    更多
  • 食品 & 飲料

    在食品製造業中,除了需要應對「食品安全」、「糧食安全」、「降低成本」這些傳統挑戰,還需要面對病菌和減少勞動力的挑戰。
    橫河Yokogawa與客戶密切合作、共同應對挑戰、提出理想工廠的解決方案,幫助生產廠商創造更舒適的工作環境。

    更多

相關產品&解決方案

  • 分散式控制系統(DCS)

    我們的分散式控制系統 (DCS) 可自動化和控制製程,提高績效。 已經超過 10,000 家工廠利用Yokogawa DCS 實現生產目標。

    更多

置頂