Background of This Project

PTTEP, Thailand
PTTEP, Thailand

With the Arthit project, PTT Exploration and Production Plc. (PTTEP) has for the first time engaged in every stage of developing a new gas field, from exploration to production. For this project, PTTEP built the Arthit Central Processing Platform, one of the largest of its type in Asia and the first ever in Thailand to be moved into position using the floatover method. It is located in the Navamindra Petroleum Area, which is in the Gulf of Thailand about 230 km off the coast of Songkhla Province. At this location, the water depth is approximately 80 meters. In the first project phase, six wellhead platforms have been connected to the central processing platform. Ultimately, 50 wellhead platforms will be constructed.

South East Asia

Production Overview

  • Natural gas exported to PTT Riser Platform via a 42 inch, 200 km subsea pipeline
  • Daily contractual quantity of 330 MMSCFD
  • Maximum daily quantity of 363 MMSCFD
  • Stabilized condensate exported to Bongkot FSO2 via an 8 inch, 30 km subsea pipeline
  • Production rate: 15,000 to 20,000 BPD

About PTTEP

PTTEP is the first and only Thai-operated petroleum exploration and production (E&P) company. In line with a cabinet resolution calling for a flexible E&P entity that would provide maximum benefit to Thailand, it was established on June 20 in 1985 by the Petroleum Authority of Thailand (PTT). Its mission is to explore for, develop, and produce petroleum from onshore and offshore sources in Thailand and other countries.

The Challenges and the Benefits

A key challenge in this project was the tight schedule during the detail engineering and procurement stage. Yokogawa succeeded in delivering its systems on time and without compromise in quality.With an automation system comprised of the Yokogawa CENTUM CS 3000 Production Control System (DCS) and the ProSafe-RS Safety Instrumented System (SIS), this is the first offshore platform in Thailand that is designed to make full use of FOUNDATION fieldbus technology.

CENTUM CS 3000
CENTUM CS 3000

During the pre-commissioning work for the FOUNDATION fieldbus instruments, the challenge was integrating the CENTUM CS 3000 system with instruments from other vendors. With the great vendor support provided by the Yokogawa service team, all devices were successfully connected and full integration was achieved.

 

This platform also had many new operators who required training on an operator training system (OTS). An OmegaLand simulator provided by Yokogawa helped control room operators quickly come up to speed in running platform processes.

Thanks to Yokogawa's highly reliable systems and products, a safe working environment has been achieved for the 120 operators, engineers, maintenance staff, and other personnel stationed on this platform.

The Arthit Central Processing Platform
The Arthit Central Processing Platform

Customer Satisfaction

"A lot of modification and fine tuning of the automation system occurred during startup, but this was not difficult for Yokogawa. The system has a lot of capability and flexibility. With great support from Yokogawa Thailand, the DCS and SIS on the Arthit platform have met our requirements. During startup and commissioning of the platform, we never had problems caused by the Yokogawa system." Theeraporn Kongwilai, Instrument Engineer.

<System Details>
Systems:

CENTUM CS 3000 R3 (DCS)
ProSafe-RS (SIS)
OmegaLand (OTS)
Plant Resource Manager (PRM)

System Configuration:
HIS x 5, ENG x 2 (DCS), SENG x 2 (SIS), PRM x 1, FCS x 4
Conventional type I/O: 1104 (HART I/O: 368)
50 FOUNDATION fieldbus segments

The Arthit Central Processing Platform

相关行业

  • 石油和天然气

    横河电机在石油天然气行业的各个环节均拥有丰富经验,业务覆盖海上与陆上设施、管道运输、终端处理及深水作业等领域。我们提供的解决方案能够提升安全水平、确保设备准确可靠地运行,并有效提高工厂运营效率。

  • 上游

    上游行业涵盖海上和陆上作业,包括井口自动化、分馏、完井和分离等环节,旨在开采并初步处理地下或水下原油与天然气。

    石油被采至地表后,必须在运输前进行分离。通常在初级和二级分离阶段,通过三相分离将气流、水流和油流分开。气体输送需要管道,并可在上游阶段加入分馏处理。液体则存入储罐或通过管道输送至加工环节,此过程需准确的液位测量。

相关产品&解决方案

  • 工厂资源管理系统(PRM)

    为确保工厂运行的高可靠性和稳定性,是否对设施进行了妥善管理?PRM(工厂资源管理系统)有助于提升全厂生命周期内的维护计划质量,并优化维护成本。

  • 集散控制系统(DCS)

    横河电机的集散控制系统(DCS) 可实现工业过程的自动化和控制,并提高业务绩效。30,000多套系统的经营者选择采用横河电机的DCS来实现其生产目标。


置顶
WeChat QR Code
横河电机(中国)有限公司