China is rapidly developing into a major global economic power. To succeed in its drive to be the center of manufacturing for just about everything, China has an ever growing need for energy. One of the big challenges is securing sufficient gas supplies for the next 25-30 years. Like the country as a whole, Shanghai is undergoing a transformation into a major global economic center.

In January 2007 it was announced that CNOOC Gas and Power Limited, a subsidiary of China National Offshore Oil Corporation, had signed an agreement with Shenergy Group Limited for the development of the Shanghai LNG terminal by Shanghai LNG Company Limited (SHLNG).

The LNG is transported from Malaysia to Shanghai, the economic hub of east China. This is the third LNG terminal in China, with the others being in Guangdong and Fujian. Its current gas production capacity is 3 million tons per year, and a second construction phase starting in 2011 will double that.

The Shanghai LNG terminal is comprised of an LNG dock, three 160,500 m3 receiving tanks, regasification facilities, and a 40 km subsea gas trunk line to Shanghai.

For this project, Yokogawa China successfully installed and commissioned Yokogawa's CENTUM CS 3000 distributed control system (DCS), ProSafe-RS safety instrumented system (SIS), STARDOM network-based control system, OmegaLand operator training system (OTS), Exaquantum PIMS, and PRM asset management system as well as systems from other vendors.

Central control room
Central control room

The Challenges and the Solutions

Safety
Safety is an absolute requirement for this LNG terminal. The ProSafe-RS SIS is fully integrated with the CENTUM CS 3000 DCS, providing operators a unified operating environment in which they can monitor all DCS and SIS loops from the same human machine interface (HMI).

The layout of the central control room is designed with safety in mind. The mimic panel consoles for the fire and gas system and the emergency shutdown system follow the same design. A large screen displays graphics of plant facilities as well as video from CCTV cameras, so operators can easily spot problems and take quick action. All systems throughout the terminal are integrated with the CS 3000 DCS, allowing the Exaquantum PIMS to gather and process data from nearly 1,500 processes and display this in 30 different management level screens that provide information on plant performance, gas demand scheduling, gas production, gas specification, and nomination & allocation.

For added safety, Yokogawa installed its OmegaLand OTS. This simulator is used by both new and veteran operators to acquire and brush up on essential plant operation skills.

Steady gas supply
Shanghai relies on this LNG terminal for 40% of its natural gas, with the remainder coming from the West-East Gas Pipeline and a coal gasification plant.The CS 3000 DCS is the terminal's main control system and its field control stations (FCS) are highly reliable, with an availability of more than 99.99999% (seven 9s). The pipeline delivering gas to Shanghai is accurately monitored and controlled using Yokogawa's STARDOM network-based control system and the FAST/TOOLS SCADA monitoring package. The terminal operates reliably around the clock, 365 days a year.

Maximum automation
A room with engineering workstations is located right next to the central control room to facilitate the efforts of SHLNG's engineers to automate the terminal's control loops.Currently more than 90% of the control loops have been automated, bringing tremendous benefits. SHLNG is now considering certain procedural changes that will yield additional improvements in this area, and is using the OmegaLand simulator to optimize each loop's control strategy.

Effective use of asset management system (PRM)
Before plant start-up, each loop was checked to make sure that wiring had been done correctly, signals were being correctly transmitted, field devices were healthy, and valves were responding accurately to controller output signals. By helping to accurately check all these functions, PRM made it possible to complete the plant start-up ahead of schedule. And by monitoring the status of all field devices and issuing an alarm to maintenance engineers when preset conditions are reached, PRM makes possible a proactive maintenance approach that significantly reduces total cost of ownership.

Customer Satisfaction

Li Wen, Director of SHLNG's Facility Equipment Department, said, "We completed the first phase of this project and are supplying gas to Shanghai every day without any problems. We supply nearly 40% of the gas used by Shanghai. It follows that this role of providing a stable gas supply is a very important one. We very much appreciate Yokogawa's highly reliable systems and products. We will continue to improve our operations and will work to make more effective use of the OmegaLand OTS, PRM, and Exaquantum. We plan on working with Yokogawa for a long time to come."

Engineering room (DCS/ESD/FGS displays)

Engineering room (DCS/ESD/FGS displays)

Rack room (CENTUM FCS cabinets)

Rack room (CENTUM FCS cabinets)

ProSafe-RS SIS

ProSafe-RS SIS

<Project Information>

DCS: CENTUM CS 3000 (I/O: 1,600 points)
ESD: ProSafe-RS (I/O: 700 points)
Pipeline SCADA: STARDOM (I/O: 600 points)
OTS: Exatif & OmegaLand
PIMS Exaquantum (1,500 points of data on 30 pages)
Asset management system: PRM
Fire & gas system: GE-GMR (I/O: 1,200 points)
Fire & gas detector: CCTV flame, gas detector, beacon, MAC, etc/
Large screen: Planar

相关行业

  • 储运终端

    如今,不仅石油、天然气和石化行业,包括液化天然气/液化石油气以及散货行业在内的众多终端用户,都面临着共同的物流挑战。这些挑战包括:缩短产品交付时间、提升装载效率、适应生产工艺变更、加强安全性、提高管理效率、降低劳动力成本、集成数据系统、实现运营可视化、优化交通管理等等。

    横河电机数十年来持续提供解决方案,致力于满足客户在终端自动化与管理方面的需求。

  • LNG供应链

    自液化天然气(LNG)进口到日本以来,横河电机通过提供传感器、分析仪、控制与信息系统,已深耕LNG自动化领域超50年。横河电机是全球液化天然气供应链(包括液化、运输和再气化环节)大型自动化供应商之一。

  • LNG再气化与储存

    横河电机的生产控制系统在全球54座液化天然气(LNG)接收站投入运行,覆盖日本三分之二的接收站。横河电机通过涵盖装载、储存、再气化及计量在内的全流程解决方案,助力LNG接收站实现稳定高效的天然气供应。

相关产品&解决方案

  • FCJ All-in-one PLC/RTU

    The brick type model FCJ autonomous controller fulfills the basic requirements of the utility control. It also provides the reliability for the SCADA communication with network redundant capability.

  • FCN-RTU

    现场控制节点(FCN)自治型控制器的低功耗型号能够在缺乏能源的偏远地区使用。

  • SIS (SIL3) ProSafe-RS

    ProSafe-RS是一款安全仪表系统,已获得德国认证机构(德国莱茵TÜV)认证,符合IEC 61508标准中规定的安全完整性等级(SIL)3级要求。

  • 过程控制PLC/RTU

    我们的过程控制PLC和远程终端单元(RTU)可以帮助用户优化从工厂到远程位置的操作。

  • 集散控制系统(DCS)

    横河电机的集散控制系统(DCS) 可实现工业过程的自动化和控制,并提高业务绩效。30,000多套系统的经营者选择采用横河电机的DCS来实现其生产目标。