Output/fuel: 1200 MW (2 × 600 MW), oil/gas fired
Owners: Tuas Power Pte Ltd, Singapore
Overview: The construction of Tuas Power Station started in the mid 1990s. The plant has steadily grown to be a significant player in the competitive Singaporean electricity market. Stage One of Tuas Power Station is equipped with the country's largest steam generators which are capable of producing 600 MW each.

Project

Tuas Power Station: Plant view
Safe and Efficient Power Plant Operation /
Tuas 1 Power Plant

Operation date: 1999
Project type: Greenfield site
Plant configuration:
Boilers: Babcock-Hitachi, Japan
Steam turbines: Hitachi, Japan
Overview: Yokogawa supplied an integrated distributed control system (DCS) for this plant's very large power generation units as part of the work in stage one. Yokogawa Electric Asia Pte. Ltd., Singapore produced the control system in Singapore and carried out all engineering work.

(Solutions/benefits)
Single source solution:
The plant successfully entered commercial operation on schedule and the plant owner attributed this in part to Yokogawa's good performance in delivering both products and services.
On-time commercial operation:
In addition to supplying Instrumentation & Control (I&C) equipment, Yokogawa handled system design/engineering, configuration, project management, commissioning services and maintenance. Operator/engineer training on a replica simulator and control room design were also provided.

System

Tuas Power Station: Full replica simulator
Full Replica Simulator

Control scope:
Coordinated boiler and turbine controls including:
burner management system
electrical distribution system
water and waste water treatment
other auxiliary plant controls

System equipment:
CENTUM CS
Computer station for unit performance calculation
Full scope, high fidelity training simulator
Sequence event monitoring system
Emergency shutdown system

(Replica Simulator Showcase)
A full scope, high fidelity training simulator was supplied by a wholly owned Yokogawa subsidiary, TechComm Simulation Pty Ltd. This simulator provides training in all aspects of operating complex plant systems. It has made a significant contribution in raising the skill levels of the highly motivated Tuas Power Station workforce.

Central Control Room (CCR) Design by Yokogawa

Tuas Power Station: Control Room Design

(CCR Design Showcase)
Yokogawa also designed the Tuas Power Station's Central Control Room, which has won praise from users for its good operating environment. Our CCR design methodology emphasizes the importance of sound ergonomic design in reducing operator errors and facilitating the smooth running and control of processes.

相關業種

  • 電力

    1970 年代中期,Yokogawa 隨著 EBS 電力控制系統的推出,正式投入電力產業。此後,Yokogawa 持續深化相關技術與能力的研發,致力於為全球客戶提供最佳的服務與解決方案。

    為在瞬息萬變的全球電力市場中發揮更積極的角色,Yokogawa 建立並營運全球電力解決方案網絡,強化集團內部的協同合作,整合全球資源與產業專業。Yokogawa 的電力產業專家攜手合作,為每一位客戶量身打造最符合其高度專業需求的解決方案。

  • 火力發電

    以煤、石油或天然氣為燃料的火力發電,至今仍占全球發電量的大宗。

相關產品&解決方案

  • 分散式控制系統(DCS)

    我們的分散式控制系統 (DCS) 可自動化和控制製程,提高績效。 已經超過 10,000 家工廠利用Yokogawa DCS 實現生產目標。


定頂