Total Solutions Enhance a Plant's Workforce
Location: Tuas, Singapore
Output/fuel: 1200 MW (2 × 600 MW), oil/gas fired
Owners: Tuas Power Pte Ltd, Singapore
Overview: The construction of Tuas Power Station started in the mid 1990s. The plant has steadily grown to be a significant player in the competitive Singaporean electricity market. Stage One of Tuas Power Station is equipped with the country's largest steam generators which are capable of producing 600 MW each.
Project
Safe and Efficient Power Plant Operation /
Tuas 1 Power Plant
Operation date: 1999
Project type: Greenfield site
Plant configuration:
Boilers: Babcock-Hitachi, Japan
Steam turbines: Hitachi, Japan
Overview: Yokogawa supplied an integrated distributed control system (DCS) for this plant's very large power generation units as part of the work in stage one. Yokogawa Electric Asia Pte. Ltd., Singapore produced the control system in Singapore and carried out all engineering work.
(Solutions/benefits)
Single source solution:
The plant successfully entered commercial operation on schedule and the plant owner attributed this in part to Yokogawa's good performance in delivering both products and services.
On-time commercial operation:
In addition to supplying Instrumentation & Control (I&C) equipment, Yokogawa handled system design/engineering, configuration, project management, commissioning services and maintenance. Operator/engineer training on a replica simulator and control room design were also provided.
System
Full Replica Simulator
Control scope:
Coordinated boiler and turbine controls including:
burner management system
electrical distribution system
water and waste water treatment
other auxiliary plant controls
System equipment:
CENTUM CS
Computer station for unit performance calculation
Full scope, high fidelity training simulator
Sequence event monitoring system
Emergency shutdown system
(Replica Simulator Showcase)
A full scope, high fidelity training simulator was supplied by a wholly owned Yokogawa subsidiary, TechComm Simulation Pty Ltd. This simulator provides training in all aspects of operating complex plant systems. It has made a significant contribution in raising the skill levels of the highly motivated Tuas Power Station workforce.
Central Control Room (CCR) Design by Yokogawa
(CCR Design Showcase)
Yokogawa also designed the Tuas Power Station's Central Control Room, which has won praise from users for its good operating environment. Our CCR design methodology emphasizes the importance of sound ergonomic design in reducing operator errors and facilitating the smooth running and control of processes.
Industrias
-
Energía
A mediados de la década de 1970, Yokogawa inició su participación en el negocio de la energía con el lanzamiento del Sistema de control eléctrico EBS. Desde entonces, Yokogawa ha continuado firmemente con el desarrollo de nuestras tecnologías y capacidades para proveer los mejores servicios y soluciones a nuestros clientes en todo el mundo.
Yokogawa ha operado la red de soluciones de energía globales para jugar un papel más activo en el dinámico mercado de energía global. Esto ha hecho un posible un trabajo en equipo más unido dentro de Yokogawa, el cual conjunta nuestros recursos globales y nuestra especialización en la industria. Los expertos en el sector de energía de Yokogawa trabajan juntos para brindar a cada cliente la solución que se adapta mejor a sus requerimientos sofisticados.
-
Térmico
La energía térmica a partir de carbón, petróleo o gas como combustible representa la mayor parte de la generación de electricidad en todo el mundo.
Productos y Soluciones Relacionadas
-
CENTUM CS
- CENTUM CS
- Yokogawa's legacy distributed control system since 1993
- Widely applied in plants all over the world
-
Sistema de Control Distribuido (DCS)
Yokogawa ofrece una infraestructura operacional crítica para la automatización de procesos. Nuestro sistema de control distribuido (DCS) permite la automatización y el control de los procesos industriales y un mejor desempeño empresarial. Más de 10,000 plantas confían en el DCS de Yokogawa para cumplir con sus objetivos de producción.