Saudi Aramco Rabigh Refinery Control System Replacement (Hot Cutover)

Saudi Aramco logo
下载 (270 KB)

About Saudi Aramco and the Rabigh Refinery

Saudi Aramco Rabigh Refinery Control System Replacement (Hot Cutover) Saudi Aramco's operations span the globe and the energy industry. The world leader in crude oil production, Saudi Aramco also owns and operates an extensive network of refining and distribution facilities, and is responsible for gas processing and transportation installations that fuel Saudi Arabia's industrial sector. An array of international subsidiaries and joint ventures deliver crude oil and refined products to customers worldwide.

World-class refineries located across the country, from the Arabian Gulf to the Red Sea, reliably supply more than a million barrels of products each day to meet the needs of the Saudi Arabian and international markets. The Rabigh Refinery, located 160 kilometers north of Jeddah on the Rea Sea coast, is one such refinery operated by Saudi Aramco.

The Rabigh refinery has a 400,000 BPD crude topping facility. Crude is delivered by tankers through the Saudi Aramco Rabigh port. The main products are fuel oil, naphtha, and jet fuel. LPG and oil are used as fuel for the refinery while recovered sulphur is bagged and shipped.
https://japan.aramco.com/en/creating-value/services/projects/petro-rabigh

Background of This Project

Background of This Project

 

As part of an upgrade project to reap the benefits of the latest technology, Saudi Aramco Rabigh Refinery awarded Yokogawa this project to replace the existing control system with a state-of-the-art distributed control system (DCS). The entire complex was previously controlled by single loop controllers and a Foxboro IA system.

The decision to introduce the new system was motivated by the need to reduce the high maintenance costs of the single loop controllers and to obtain improved functionality. The selection criteria emphasized system reliability and the ability to replace the system while the plant was operational (hot cutover).

With SNC Lavalin Inc. as the design contractor and Carlo Gavazzi as the construction contractor, Yokogawa delivered the control system with the engineering assistance of its Middle East office in Bahrain.

In addition to the DCS, the project scope included the implementation of an oil blending system (OBS), multi-variable control (MVC), and heater pass balance control by Yokogawa Middle East. The OBS implementation is in progress while the MVC implementation was successfully completed in March 2007.Twenty existing and ten newly installed subsystem interfaces increased the complexity of the hot cutover and function test.

Team Effort Always Pays

According to the Saudi Aramco Project Management Team Lead Engineer, "One of the key factors leading to the smooth hot cutover was the team effort. Every activity was meticulously planned to ensure a safe change over. This was possible because everyone adhered to the procedures stipulated before the hot cutover was started by all the groups involved."

The major challenge was the integration of the subsystem interfaces. "We never felt the complexity of the integration work", said the Control System Engineer, "and this was possible since the integrated site acceptance test (ISAT) was so comprehensive."

Hot Cutover Challenges

The major challenges were winning the operators' acceptance of the new system, scheduling and coordinating the ISAT with all the subvendors, and quickly troubleshooting the problems encountered during the hot cutover.

Pre and post hot cutover planning was done in several meetings between Saudi Aramco, SNC Lavalin, Carlo Gavazzi, and Yokogawa Middle East. Various check sheets and procedures were in place for the tuning of loops and the final handover.

What This Project Achieved

  1. A smooth and safe switchover to the new system
  2. An easy-to-use, easy-to-engineer system, plus various post-installation enhancements
  3. Tuned controllers for smooth plant operation and better traceability of process upsets
  4. Various other improvements thanks to advanced process control and MVC implementation

What's Next?

Having successfully completed the control system replacement project, Yokogawa was awarded the Saudi Aramco - Sumitomo Joint Venture, PETRORabigh project to engineer and install the CS 3000 DCS for a huge petrochemical complex that is being built next to the refinery.

SYSTEM DETAILS

Control system: CENTUM CS 3000 R3
Number of I/O points: 5000
System configuration  
No. of domains: 06
Engineering stations (ENG): 02
Human Interface Stations (HIS): 14
Field Control Stations (FCS): 12
EXAOPC: 01
Plant Resource Manager (PRM): 01

行业

  • 油气下游

    近年来,油气下游产业面临着越来越多的挑战。这些挑战包括待加工原料的特性变化、工艺设施及设备的老化、能源成本的上升、缺乏能够使炼油厂安全有效运行的熟练技术工人,以及市场和客户的需求不断变化。

    多年来,横河与许多下游公司合作,致力于提供应对这些挑战和问题的工业解决方案。横河的VigilantPlant解决方案帮助工厂投资者尽可能实现最大的盈利能力和工厂内可持续的安全。

    更多
  • 精炼

    在不断变化的市场中,炼油厂不仅是原油加工单位,而且是利润中心。同时,人们强烈意识到炼油厂设施安全性的重要。为了实现盈利、效率及环境保护的长期目标,需要包括计划、调度、管理和控制的总体生产解决方案。凭借在自动化领域多年积累的专业知识,横河可以为您提供经济实惠的完善的整体解决方案,改善操作并使世界更清洁。

    更多

相关产品&解决方案

  • CENTUM OPC服务器(Exaopc)

    Exaopc是可靠的高性能OPC服务器,用于数据访问(DA)、报警和事件(A&E)、历史数据访问(HDA)和批处理信息,也是CENTUM系列过程控制系统的安全接口。

    更多
  • 切换规划和实施

    通过精心规划和实施,横河电机可以帮助客户系统实现安全、经济、增值的冷热切换迁移过程。

    更多
  • 工厂资源管理系统(PRM)

    工厂资源管理系统(PRM)是用于横河电机资产卓越的一个关键平台。该平台旨在改进操作和维护,通过获得更大的可预测性,使工厂资产的可靠性和可用性最大化。

    更多
  • 集散控制系统(DCS)

    横河电机的集散控制系统(DCS) 可实现工业过程的自动化和控制,并提高业务绩效。30,000多套系统的经营者选择采用横河电机的DCS来实现其生产目标。

    更多

置顶
WeChat QR Code
横河电机(中国)有限公司