Executive Summary

SK Energy, Ulsan, Korea
SK Energy is the energy and chemical affiliate of South Korea's SK Group. Korea's largest oil refiner (1.1 million barrels of daily refining capacity), SK Energy controls about 35% of Korea's fuel retailing market and operates 4,270 service stations. The firm is involved in oil exploration and production in 15 countries and has proven reserves of 500 million barrels of oil equivalent. SK Energy imports coal and liquid petroleum gas (LPG), and claims a 44% share of the Korean LPG market. The company supplies natural gas to Seoul and other cities in Korea, and also makes lubricants, low–pollutant gasoline, and petrochemicals.
SK Energy decided to construct a new fluid catalytic cracking (FCC) facility at its Ulsan refinery to convert bunker C oil into high quality, low sulfur, and high value-added refined liquid products such as gasoline and diesel. This decision was made for the following reasons:
- Respond to growing demand for cleaner burning distillate fuels and falling demand for residual fuels such as bunker C fuel oil due to stricter environmental regulations
- Increase gasoline output to meet growing demand through 2010
- Enhance the company's price competitiveness in the global fuel market
- Increase the complexity ratio of the Ulsan refinery, which is lower than that of the company's other refineries in South Korea
For this new FCC facility, SK Energy awarded Yokogawa Korea a contract to install a state-of-the art CENTUM CS 3000 distributed control system (DCS) and field instrumentation. Working on a very tight project schedule, Yokogawa Korea successfully completed all control system and instrumentation engineering and the new facility was able to launch production of commercial-grade products on schedule.
The Challenges and the Solutions
The overall project goals were identified during the feasibility study and project planning phases, and emphasized schedule, quality, cost, and safety.
A major challenge was the tight project schedule as SK Energy needed to complete construction of this new FCC plant in just 15 months and begin a pilot program of operational testing no later than mid 2008. Normally such plants take at least two years to complete and commission, and require another three months before they can be operating at full capacity.
After receiving this order in August 2006, Yokogawa Korea's project team worked closely with personnel from three different EPC companies, holding biweekly technical meetings to discuss and decide on hardware and software specifications.
For this new FCC project, more than 40 sub-system interface cards and a Modbus interface were utilized to integrate systems from 14 partner companies with the CENTUM CS 3000 DCS. This enabled status information and other types of data from compressors, blowers, filter systems, dryers, and a wide variety of other types of equipment to be transferred to the DCS and viewed by operators on various graphic displays at the human interface stations (HIS). By keeping constantly up to date on the status of all processes, the operators are able to easily analyze and understand the process situation and take action immediately. In addition, all production data gathered at the DCS can be transferred to higher level computer systems via an OPC interface. That data can be stored for the tracking of overall production efficiency and used for asset management analysis and other types of plant equipment studies. In these ways, integration contributes to visualization of all plant data, significantly reduces labor costs, and ensures safe plant operation.

The new central control room
Customer Satisfaction
In appreciation for its key contribution with the control system and instrumentation engineering, Yokogawa Korea was awarded a plaque by SK Energy. Following the successful completion of this project, other refiners (GS Caltex, Hyundai Oil Bank) have selected Yokogawa Korea as their technology partner.
J.W Park, Lead I&C Engineer of SK Energy, said, "Yokogawa worked collaboratively with our team through the many challenges of the FEED phase and subsequent design, build & test phases, delivering the system on time and completing preparations for the successful start-up and commissioning of this plant. Lessons have been learned which will benefit the management and planning of future projects. We commend Yokogawa for their open and honest acceptance of responsibility, support, and dedication, especially during the challenging installation, start-up, and commissioning of the plant."
Mr. Park went on to say, "SK Energy is always looking to make further improvements in its operations, and we are now considering how to improve the sustainability of our manufacturing operations. We have heating furnaces and boilers at our site and are looking for ways to save energy and reduce CO2 emissions by reducing flue gas oxygen concentrations. And for complex plant operations, we also are looking at operation support systems like Exapilot that will retain the expertise of our most expert operators and eliminate lost production. We see a great need for this function and believe it can lead to increased productivity. For these reasons, we would like to keep working together with Yokogawa Korea."

J.W Park of SK Energy
| DCS: | CENTUM CS 3000 |
|---|---|
| I/O points: | 21,500 |
| Domains: | 3 |
| Engineering stations (EWS): | 4 |
| HIS: | 43 (2 dual screens) |
| Field control stations (FCS): | 20 |
| Sub-system interface cards: | 46 |
| Field instruments: | 1,500 EJA, 400 YTA, 800 PK200 |
相关行业
-
油气下游
近年来,石油天然气下游行业正面临日益增多的挑战。这些挑战包括:需处理的原料特性不断变化、工艺设施与设备逐渐老化、能源成本持续攀升、能够安全高效运营炼油厂的熟练操作人员紧缺,以及市场和客户需求的快速变化。
多年来,横河电机与众多下游企业携手合作,提供专注于解决这些挑战与难题的工业解决方案。横河电机的 VigilantPlant解决方案助力工厂业主实现工厂内的更大盈利和可持续安全运营。
-
炼油
在不断变化的市场环境中,炼油厂不仅被视为原油加工单元,更是利润中心。与此同时,业界对这些设施的安全需求保持着高度重视。要实现长期盈利、效率提升与环境保护的目标,需要一套涵盖规划、调度、管理与控制的完整生产解决方案。凭借在自动化领域多年的专业积淀,横河电机能够为您提供高性价比的整体解决方案,助力提升运营效能,共创更清洁的世界。
相关产品&解决方案
-
集散控制系统(DCS)
横河电机的集散控制系统(DCS) 可实现工业过程的自动化和控制,并提高业务绩效。30,000多套系统的经营者选择采用横河电机的DCS来实现其生产目标。