AGL Loy Yang Replacement Integrated Control and Monitoring System Including Turbine Control & Protection System and Training Simulators

다운로드 (280 KB)

Executive Summary

Traralgon, Victoria, Australia
AGL Energy Limited, Traralgon, Victoria, Australia

AGL Energy Limited (AGL) has completed the refurbishment of all four generating units at its Loy Yang A facility as part of a total upgrade of the power station’s control system and generating units.

The Unit 4 generator at AGL’s Loy Yang A power station successfully passed its full load rejection test in late 2014, signifying the end of Unit 4’s major outage activity. The total refurbishment started in 2006. The upgrade featured co-ordinated control system for each boiler/turbine unit incorporating the latest Yokogawa model based on “set and forget” modulating control with extensive integrated plant sequencing and plant automatic run up systems.

The Challenges and the Solutions

Loy Yang’s iconic cooling towers and flue stacks near Traralgon in the Latrobe Valley have become local landmarks ever since the plant was commissioned over 30 years ago in 1982. Loy Yang is a 2,210- megawatt power station that supplies approximately 30% of Victoria’s power requirements. It is Victoria’s largest power station.

More than 30 years on, continuing efficiency initiatives in the face of rising coal costs and tougher environmental controls and the aging of many disparate control and protection systems meant that there was a need to refurbish the integrated control and monitoring systems on the 4 boilers and generators.

The contract to do this refurbishment was awarded to Yokogawa in 2006 with a scope that included creating a common station plant control system, a coal handling system (from the raw coal to the power station bunkers including the auto bunkering system), changing out all the boiler control protection & monitoring systems and the replacement of the original Kraftwerk Union (KWU) turbo generator control and protection systems with Yokogawa CENTUM VP turbo-machinery controllers and ProSafe -RS SIL3 rated safety systems.

The scope also included the development and supply of a high fidelity operator training simulator. This simulator was delivered before the first installation of the CENTUM VP distributed control system. Having the simulator prior to the cutover allowed the operators to become experienced in the new operator interfaces and control logic. The operators being familiar with the interfaces and logic helped with a reduction in operator error during the initial plant recommissioning.

The simulator was also used to pre-test and pre-tune the control system logic prior to commissioning. A second simulator was supplied to offer more operator training opportunities.

Over the time that this project took to complete, Yokogawa did not miss the opportunity to learn how to be more efficient, timely and ultimately provide more value to Loy Yang’s owners. Every unit outage was quicker than the previous one. Yokogawa successfully completed Unit 4’s outage early and importantly without any lost time Incidents even though at the project’s peak there was an additional 800 workers on site.

Benefits are already flowing from the new integrated control and monitoring system with one of the units having their longest continuous runs since they were built. Also according to feedback from the plant’s operators, the new control system allows more precision in the operation of the steam boilers to better cope with variations in coal quality and moisture content from the adjacent mine. The coal sometimes contains 66% water.

Loy Yang’s source of brown coal that sometimes contains 66% water
Loy Yang’s source of brown coal that sometimes contains 66% water

Details of the Upgrade

The Yokogawa CENTUM VP distributed control system installed in Loy Yang ‘A’ has over 40,000 inputs and outputs and is equipped with a total of 48 operator stations and screens in the central control room.

The co-ordinated control system for each boiler/turbine unit incorporated the latest Yokogawa model based “set and forget” modulating control with extensive integrated plant sequencing and plant automatic run up systems including:

  • Superheater steam temperature controls use an enthalpy balanced advanced model-based control, controlling spray flow to steam flow ratio to achieve desired spray stage outlet temperatures with spray valves reacting to firing and steam flow changes before steam temperatures are affected.
  • Feedwater and condensate controls operate “unattended” from initial firing pressure raising to rated load with economizer steaming protection using “set and forget” features.
  • The firing controls now automatically compensate for the rapid large changes in fuel quality typical of brown coal with very high moisture content.
  • A control system featuring fault tolerance, with “graceful degradation” to standard cascade system in the event of faulty inputs to advanced control algorithms.
  • Automatic Generation Control with “SMART” sliding pressure feature.
  • Sequence of events reporting to 1-millisecond resolution.
  • Advanced “Intelligent” alarming software incorporated in the ICMS to prevent alarm flooding during periods of major plant activity.
  • A Yokogawa ProSafe-RS safety instrumented system ensures boiler and turbine plant integrity.
  • The control of the extensive coal handling plant was refurbished using the Yokogawa FA-M3 family of high speed versatile programmable logic controllers.
  • The Yokogawa CENTUM VP distributed control system for the Loy Yang ‘A’ project is integrated with an extensive suite of plant performance reporting and management packages.
  • Yokogawa Exaquantum plant information management system (PIMS).

Part of the new Loy Lang control room layout
Part of the new Loy Yang control room layout

Customer Satisfaction

AGL Loy Yang’s previous engineering and maintenance manager, Ron Tomasetti, said during the initial implementation phase Loy Yang was already seeing yield improvements in running the automated control system which required less operator input but gave tighter control of the system. “From what we’ve seen to date, thermal efficiency improvements of 2-3% across the plant are possible.”

Mr. Tomasetti said this was a ‘win-win’ for the power station, electricity users, and the environment. “Efficiency and environmental benefits are one and the same thing. If you run the plant efficiently, you burn less fuel and also avoid spikes in steam temperature. This preserves the life and integrity of the whole steam circuit (comprising boiler, valves etc.) and also results in a higher level of plant safety.”

With the ICMS conversion project complete, it marks the end of an eight year project between AGL Loy Yang and Yokogawa Australia but our cooperation continues with Yokogawa providing a long term service & support agreement. Pictured below is the ceremonial completion of the project with the “filling in” of the last eye on the daruma doll.

Ceremonial completion with  daruma doll

업종

  • 전력

    1970년대 중반, Yokogawa는 EBS 전기 제어 시스템 (EBS Electric Control System)의 출시와 함께 전력 사업에 진출했습니다. 그 이후로 Yokogawa는 전 세계 고객에게 최상의 서비스와 솔루션을 제공하기 위한 기술과 역량의 개발을 꾸준히 지속해 왔습니다.

    Yokogawa는 역동적인 글로벌 전력 시장에서 더욱 적극적인 역할을 수행하기 위해 글로벌 전력 솔루션 네트워크를 운영했습니다. 이로 인해 Yokogawa 내에서 보다 긴밀한 팀워크가 가능해져서 글로벌 리소스와 업계 노하우를 하나로 모았습니다. Yokogawa의 전력 산업 전문가들은 각 고객에게 정교한 요구 사항에 가장 적합한 솔루션을 제공하기 위해 협력합니다.

    See More
  • 화력발전

    석탄, 석유 또는 가스를 연료로 사용하는 화력발전은 전 세계적으로 대부분의 전력을 생산하고 있습니다.

    See More

Related Products & Solutions

  • CENTUM VP

    CENTUM VP는 HMI(Human Machine Interface), FCS(Field Control Stations), 제어 네트워크(Control Network)로 구성된 단순하고 일반적인 아키텍처를 가지고 있습니다.

    See More
  • FA-M3

    초고속, 안정된 제어, 링크 기능 및 향상된 네트워크 성능을 특징으로하는 FA-M3V 컨트롤러는 모든면을 개선하여 최고 속도로 안정적인 제어를 제공함으로써 만들어졌습니다.

    See More
  • SIS (Up to SIL 3) ProSafe-RS

    ProSafe-RS는 IEC 61508에 명시된 SIL(Safety Integrity Level) 3을 충족하는 것으로 독일 인증 기관(TÜV)의 인증을 받은 안전 계측 시스템입니다.

    See More