Executive Summary
Thai Solar Energy Public Company (TSE) recognizes the importance of providing clean, stable and sustainable power through a mixed portfolio of conventional and renewable energies to meet the increasing power market demand. Since its establishment in 2008, the company has set the target of becoming a world-class regional leader in providing renewable energy through reliable leading-edge technologies to serve the needs of both industry and society.
TSE aims to establish a solid foothold in the solar power industry while delivering other renewable solutions not only in Thailand but also internationally, specifically in Asia and Oceania. As of today, TSE has a total power production capacity of over 145 MW in Thailand, which consists of a mixed energy production portfolio of 16 solar photovoltaics (PV) utility plants, 14 solar PV rooftop projects, 3 biomass power plants and the most recently built floating solar PV plant in Prachinburi Province, which commenced commercial operation on May 25, 2021. This floating solar project is the company's first private pilot project with an installed capacity of 8 MW peak (MWp). The total project area exceeds 11 hectares with an investment value of over 200 million THB (approx. 5.95 million USD).
Project Outline
Hitachi Consumer Products (Thailand), Ltd., the end-user of the electricity from the PV plant, operates various industrial plants in a broad range of businesses such as agriculture, food, and consumer products, and these process plants are usually equipped with water supply storage ponds, cooling ponds and wastewater treatment ponds. Seeing the opportunity to maximize usage of the pond surfaces by adopting a floating solar power plant for clean power production, TSE proposed its floating solar plant, which is designed to produce 8 MWp of clean power for use at Hitachi’s factories. The idea was readily accepted, and both companies concluded a 25-year private power purchase agreement (private PPA).
The TSE floating solar PV project makes the most of the ponds within the factory sites which supply water for plant production, by generating clean electricity using photovoltaic technology, thus adding value. Moreover, this hybrid utility setup has the further benefit that the pond water can be used to remove the excess heat generated on the surface of the solar panels.
At present, the project can produce peak power of 6.475 MWAC. With the installation of 16,492 monobifacial PV modules with power capacity of 8.081 MWp in two ponds with an area of 57,094 m2, annual power generation is 12.54 GWh, or an average of 34,356 kWh/day.
TSE's floating solar PV project, a collaborative partnership between private companies to produce solar power on water surfaces, is closely aligned with the country’s renewable initiative to promote clean energy and sustainable energy for the country.
This is TSE’s first floating solar project connected to a private grid in collaboration with Hitachi. TSE aims to expand its solar power business expertise and build more solar plants to feed power exclusively to private companies in conjunction with the national policy of supporting environmentally friendly and energy efficiency initiatives.

Outline of Supply
Yokogawa CI Server is installed to monitor and control the solar power production facility including the substation and major equipment such as inverters, meters, weather stations, and motor protection relays (MDB), and to manage the “Zero Export” function to the grid.
Zero export is a common control function for private grid type solar projects whereby PV energy is 100% consumed exclusively by the off-taker with 0% limitation on active power feed-in to the grid. The CI Server-based monitoring and control system is engineered to control active power generation in reaction to active load changes so as to minimize power leaks to the transmission line that could cause power trips. The CI Server system is also equipped with comprehensive monitoring functions including automatic daily alarms and alerts via email, switchgear on-off control and performance ratio calculations.
The FA-M3 controllers used in this project are provided with two types of CPU: the new e-RT3 CPU runs Python scripts for the communication link to the CI Server; and the standard CPU is used to connect hardwired discrete inputs/outputs for status monitoring and sequence control.

The Challenges and the Solutions
TSE faced the intermittent power supply profile of solar power generation which did not match the load profiles, causing frequent power trips and reductions in plant efficiency. Yokogawa Thailand proposed to implement a new CPU-based Python-programmable PLC to communicate with inverters and meters to collect data from the field and deliver it to the supervisory control and data acquisition system (SCADA, now the CI Server is used). Communication in Python enables more stable and quicker data retrieval compared to Modbus communication. Besides, the included sequence CPU enables inverter data processing and executes power limit calculations.
The total power consumption of the plants of Hitachi Consumer Products (Thailand), Ltd. is estimated to be 10 MW during working days (Monday to Friday). The floating solar site is expected to generate 8 MWp of that 10 MW load, with the remaining 2 MW to be supplied by the national grid.
During commissioning, however, Yokogawa’s commissioning team found that on Sundays when the factories are closed, and from 11:00 am to 2:00 pm during the lunch break on working days, the power consumption falls to 2 MW. During these periods, power generation far exceeds power demand, resulting in excess power flow on the transmission line and causing the circuit breaker to trip frequently. As a result, TSE was losing the opportunity to sell electricity to Hitachi during those trips, making the solar power plant less efficient.
Immediately after advising TSE of this challenge, Yokogawa Thailand worked closely with TSE and the engineering, procurement and construction contractor (EPC) to add an algorithm for tuning the inverters as quickly as needed to prevent tripping of the breaker. Yokogawa FA-M3 and e-RT3 enabled stable two-way data communication, quick ramp rate tuning, and swift response to inverters, helping to optimize plant operation and increase plant efficiency.

Customer Satisfaction
Yokogawa Thailand and the EPC made the right approach by focusing on solving problems and optimizing operations. The solution has helped eliminate the customer’s problem of frequent power trips that lowered the plant efficiency.
Yokogawa Thailand and the EPC got involved in this project from the initial phase, and planned and worked on the project specifications and design together with TSE. This helped Yokogawa comprehend the project goal from the customer’s perspective and provide an appropriate solution tailored to the customer’s needs. Our solution packaged with CI Server and FA-M3 controllers running Python enables stable two-way data communication and quick tuning and control of inverters, thus minimizing power trips and indirectly improving plant operation efficiency. Yokogawa Thailand is committed to providing reliable remote engineering support from Bangkok to ensure that TSE does not lose opportunities to sell electricity to end-users.
With such commitment and mutual understanding, TSE is very satisfied with Yokogawa products and services and intends to continue working with Yokogawa and the EPC for the upcoming 1 MW solar plant expansion involving a SCADA for monitoring, control, and engineering for integrating the upper system of the existing floating solar plants.
Project Overview
| Customer | ENSYS Co., Ltd. |
|---|---|
| Owner | Thai Solar Energy Public Company Limited (TSE) |
| Plant type | Floating solar PV |
| Capacity | 8 MW |
| Project type | Grassroot new project |
| Scope | Collaborative Information (CI) Server,FA-M3 PLCs |
Related Industries
-
재생에너지
재생에너지는 환경 보호에 기여하고, 사회와 산업이 지속가능한 발전 목표로 나아가도록 지원합니다. Yokogawa는 전 세계적으로 재생에너지 애플리케이션 솔루션을 제공하며 지속가능한 발전 목표 달성에 기여하고 있습니다.
2024년 Yokogawa는 BaxEnergy 인수를 통해 에너지 전환 혁신에 대한 의지를 한층 강화했습니다. BaxEnergy는 글로벌 에너지 기업과 산업 운영자를 위한 통합 서비스 파트너로, 자산 성능 관리, 전력망 제어, 사이버 보안을 포함한 엔드투엔드 솔루션을 제공합니다. 또한 다양한 제조사와 기술과의 호환성을 기반으로 풍력, 태양광, 수소, 에너지 저장 시스템(ESS)을 지원하는 소프트웨어 솔루션을 제공합니다.
-
태양광 발전
태양은 무한의 청정에너지원이며 인간은 이를 여러 가지 방법으로 오랫동안 사용해 왔습니다.
-
Power(전력)
1970년대 중반, Yokogawa는 EBS 전기 제어 시스템 (EBS Electric Control System)의 출시와 함께 전력 사업에 진출했습니다. 그 이후로 Yokogawa는 전 세계 고객에게 최상의 서비스와 솔루션을 제공하기 위한 기술과 역량의 개발을 꾸준히 지속해 왔습니다.
Yokogawa는 역동적인 글로벌 전력 시장에서 더욱 적극적인 역할을 수행하기 위해 글로벌 전력 솔루션 네트워크를 운영했습니다. 이로 인해 Yokogawa 내에서 보다 긴밀한 팀워크가 가능해져서 글로벌 리소스와 업계 노하우를 하나로 모았습니다. Yokogawa의 전력 산업 전문가들은 각 고객에게 정교한 요구 사항에 가장 적합한 솔루션을 제공하기 위해 협력합니다.
Related Products & Solutions
-
FA-M3
초고속, 안정된 제어, 링크 기능 및 향상된 네트워크 성능을 특징으로하는 FA-M3V 컨트롤러는 모든면을 개선하여 최고 속도로 안정적인 제어를 제공함으로써 만들어졌습니다.