OVER was displayed on the PV (measured value) display. How will the control output operate in this case?

If OVER is displayed, the PV value will be 105% of the measurement range. The control output will be the result that is calculated using this PV value. On a -OVER, the PV value is calculated as -5% of the measurement range.

Related Products & Solutions

  • UP35A/UP32A

    Program Controllers with 4 patterns, 40 segments, and ladder sequence functions

  • UP55A

    Program controller with 30 patterns, simultaneous monitoring, and ladder sequence function

  • UT32A-D

    Digital Indicating Controller with selectable 2-loop control and intuitive design


Top